X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0014080710022"

m
m
 
Line 510: Line 510:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:18, 17 January 2021

Well Details

Well ID: 0014080710022
Loading map...
Location: 02/10-07-001-08W4/2
Location Alias: 02/10-07-01-08 W4M
Location Alias 2: 02/10-07-001-08 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 07
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 10-7-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0034581
License Date: 1968-08-07
License Status: Issued
Spud Date: 1968-08-08
Final Drill Date: 1968-08-14
Well Total Depth: 1022.60 m
Surface Hole Latitude: 49.022837
Surface Hole Longitude: -111.059474

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-07 Obtained License
1968-08-14 Finished Drilling
1968-08-14 Production Casing Operation Performed
1968-08-14 Well Mode changed to Drilled and Cased
1968-09-12 Perforation Treatment Performed - Jet Perforation
1978-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-06-02 Perforation Treatment Performed - Jet Perforation
1979-11-22 Well Began Production
1979-11-22 Well Fluid changed to Gas
1979-11-22 Well Mode changed to Flowing
1981-12-31 Well Fluid changed to Gas
1981-12-31 Well Mode changed to Suspended
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
1988-04-21 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-12 Perforation 994.30 995.80 13
1978-06-02 Packing Device Capped w/Cement 929.00 929.00 0
1978-06-02 Perforation 897.30 898.90 13
1978-06-02 Packing Device Capped w/Cement 887.00 887.00 0
1978-06-02 Perforation 793.70 794.60 13
1978-06-02 Perforation 771.80 773.00 13
1988-04-21 Perforation 771.80 772.90 13
1988-04-21 Perforation 781.20 782.10 13
1988-04-21 Perforation 789.10 790.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 934 0.0 0.0 0.0
1980 5105 0.0 0.0 0.0
1981 3130 0.0 0.0 0.0
1983 912 0.0 0.0 0.0
1984 7547 0.0 0.0 0.0
1985 8029 0.0 0.0 0.0
1986 8091 0.0 0.0 0.0
1987 3065 0.0 0.0 0.0
1988 4580 0.0 0.0 0.0
1989 7959 0.0 0.0 0.0
1990 7058 0.0 0.0 0.0
1991 8201 0.0 0.0 0.0
1992 6552 0.0 0.0 0.0
1993 8448 0.0 0.0 0.0
1994 6189 0.0 0.0 0.0
1995 8388 0.0 0.0 0.0
1996 7862 0.0 0.0 0.0
1997 8424 0.0 0.0 0.0
1998 8658 0.0 0.0 0.0
1999 8679 0.0 0.0 0.0
2000 8718 0.0 0.0 0.0
2001 8271 0.0 0.0 0.0
2002 7752 0.0 0.0 0.0
2003 8530 0.0 0.0 0.0
2004 8485 0.0 0.0 0.0
2005 8591 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8114 0.0 0.0 0.0
2008 8650 0.0 0.0 0.0
2009 8347 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8476 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8507 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References