X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014073101003

Well Details

Well ID: 0014073101003
Loading map...
Location: 00/01-31-001-07W4/3
Location Alias: 00/01-31-01-07 W4M
Location Alias 2: 00/01-31-001-07 W4/03
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 07
Section: 31
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF COMREY 1-31-1-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0260907
License Date: 2001-10-23
License Status: Amended
Spud Date: 2001-11-16
Final Drill Date: 2001-11-18
Well Total Depth: 1071.00 m
Surface Hole Latitude: 49.079014
Surface Hole Longitude: -110.930552

For data sources see[1][2]

Well History

Date Event
2001-10-23 Obtained License
2001-11-16 Surface Casing Operation Performed
2001-11-17 Direction Drilling Operation Performed - Deviate
2001-11-18 Finished Drilling
2001-11-18 Well Log Performed
2001-11-18 Well Mode changed to Drilled and Cased
2001-11-19 Production Casing Operation Performed
2001-11-19 Rig Released
2001-12-09 Perforation Treatment Performed - Jet Perforation
2001-12-09 Well Log Performed
2001-12-15 Well Log Performed
2001-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-17 Perforation Treatment Performed - Jet Perforation
2001-12-17 Plug Back Performed
2001-12-17 Well Log Performed
2002-01-14 Perforation Treatment Performed - Fractured
2002-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-28 Perforation Treatment Performed - Jet Perforation
2002-02-28 Plug Back Performed
2002-03-18 Perforation Treatment Performed - Fractured
2002-05-29 Well Began Production
2002-05-29 Well Fluid changed to Gas
2002-05-29 Well Mode changed to Flowing
2003-12-01 Well Fluid changed to Gas
2003-12-01 Well Mode changed to Suspended
2009-01-28 Well Fluid changed to Gas
2009-01-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-11-17 139.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-09 Perforation 1026.00 1030.00 13
2001-12-17 Packing Device Capped w/Cement 1012.00 1020.00 0
2001-12-17 Perforation 995.00 997.00 14
2001-12-17 Perforation 977.00 979.00 14
2002-01-14 Fracture 977.00 997.00 0
2002-02-28 Packing Device Capped w/Cement 962.00 970.00 0
2002-02-28 Perforation 825.00 827.00 13
2002-03-18 Fracture 825.00 827.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5103 0.0 0.0 0.0
2003 7890 0.0 0.0 0.0
2009 7847 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 4416 0.0 0.0 0.0
2016 6983 0.0 0.0 0.0
2018 4008 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References