If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354200304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.971053,"lon":-112.788622,"icon":""}]} |
Location: 00/04-03-035-20W4/0 | |
Location Alias: 00/04-03-35-20 W4M | |
Location Alias 2: 00/04-03-035-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 20 | |
Section: 03 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: ALTAIR ET AL FENNBV 4-3-35-20 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0024757 | |
License Date: 1963-09-03 | |
License Status: RecCertified | |
Spud Date: 1963-09-06 | |
Final Drill Date: 1963-09-14 | |
Well Total Depth: 1595.90 m | |
Surface Hole Latitude: 51.971053 | |
Surface Hole Longitude: -112.788622 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-09-03 | Obtained License |
1963-09-14 | Finished Drilling |
1963-09-14 | Well Mode changed to Drilled and Cased |
1963-09-16 | Production Casing Operation Performed |
1963-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-09-24 | Perforation Treatment Performed - Open-Hole Completion |
1963-10-09 | Well Began Production |
1963-10-09 | Well Fluid changed to Crude Oil |
1963-10-09 | Well Mode changed to Pumping |
1965-08-17 | Perforation Treatment Performed - Cement Plug |
1965-08-19 | Well Abandoned |
1965-08-19 | Well Fluid changed to Crude Oil |
1965-08-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-09-24 | Open Hole/Barefoot Completion | 1594.40 | 1595.90 | 0 |
1963-09-24 | Acid Treatment | 1594.40 | 1595.90 | 0 |
1965-08-17 | Cement Plug | 1554.50 | 1594.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]