If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052505005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.301571,"lon":-118.611153,"icon":""}]} |
Location: 00/05-25-061-05W6/5 | |
Location Alias: 00/05-25-61-05 W6M | |
Location Alias 2: 00/05-25-061-05 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 5-25-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0409818 | |
License Date: 2009-03-20 | |
License Status: Amended | |
Spud Date: 2009-06-30 | |
Final Drill Date: 2009-07-17 | |
Well Total Depth: 3229.00 m | |
Surface Hole Latitude: 54.301571 | |
Surface Hole Longitude: -118.611153 |
Date | Event |
---|---|
2009-03-20 | Obtained License |
2009-07-03 | Direction Drilling Operation Performed - Deviate |
2009-07-05 | Surface Casing Operation Performed |
2009-07-13 | Intermediate Casing Operation Performed |
2009-07-17 | Finished Drilling |
2009-07-17 | Well Mode changed to Drilled and Cased |
2009-07-18 | Well Log Performed |
2009-07-19 | Production Casing Operation Performed |
2009-07-21 | Rig Released |
2010-01-31 | Perforation Treatment Performed - Jet Perforation |
2010-01-31 | Well Log Performed |
2010-02-01 | Perforation Treatment Performed - Fractured |
2010-02-02 | Perforation Treatment Performed - Jet Perforation |
2010-02-03 | Perforation Treatment Performed - Fractured |
2010-02-03 | Perforation Treatment Performed - Jet Perforation |
2010-02-04 | Perforation Treatment Performed - Fractured |
2010-02-04 | Well Log Performed |
2010-02-05 | Perforation Treatment Performed - Jet Perforation |
2010-02-05 | Well Log Performed |
2010-02-06 | Perforation Treatment Performed - Fractured |
2010-02-06 | Perforation Treatment Performed - Jet Perforation |
2010-02-06 | Well Log Performed |
2010-02-07 | Perforation Treatment Performed - Fractured |
2010-02-07 | Perforation Treatment Performed - Jet Perforation |
2010-02-07 | Well Log Performed |
2010-02-08 | Perforation Treatment Performed - Fractured |
2010-02-25 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-07-03 | 280.20 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-31 | Perforation | 3021.00 | 3022.00 | 10 |
2010-01-31 | Perforation | 3009.00 | 3011.00 | 10 |
2010-01-31 | Perforation | 3031.50 | 3032.50 | 10 |
2010-02-01 | Fracture | 3009.00 | 3022.00 | 0 |
2010-02-01 | Fracture | 3031.50 | 3032.50 | 0 |
2010-02-02 | Perforation | 2953.00 | 2954.00 | 10 |
2010-02-02 | Perforation | 2948.50 | 2949.00 | 10 |
2010-02-02 | Perforation | 2992.00 | 2993.00 | 10 |
2010-02-02 | Perforation | 2982.50 | 2983.50 | 10 |
2010-02-03 | Perforation | 2912.00 | 2914.00 | 10 |
2010-02-03 | Perforation | 2907.00 | 2908.00 | 10 |
2010-02-03 | Fracture | 2948.50 | 2993.00 | 0 |
2010-02-03 | Perforation | 2932.50 | 2933.50 | 10 |
2010-02-04 | Fracture | 2907.00 | 2933.50 | 0 |
2010-02-05 | Perforation | 2769.00 | 2771.00 | 10 |
2010-02-05 | Perforation | 2786.00 | 2788.00 | 10 |
2010-02-06 | Perforation | 2565.50 | 2566.00 | 10 |
2010-02-06 | Perforation | 2572.00 | 2573.00 | 10 |
2010-02-06 | Fracture | 2769.00 | 2788.00 | 0 |
2010-02-07 | Fracture | 2538.50 | 2573.00 | 0 |
2010-02-07 | Perforation | 2079.00 | 2081.00 | 10 |
2010-02-07 | Perforation | 2067.00 | 2068.00 | 10 |
2010-02-07 | Perforation | 2558.00 | 2558.50 | 10 |
2010-02-07 | Perforation | 2552.50 | 2553.00 | 10 |
2010-02-07 | Perforation | 2538.50 | 2539.50 | 10 |
2010-02-08 | Fracture | 2067.00 | 2081.00 | 0 |
For data sources see[5]