If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616040515005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.251811,"lon":-118.559706,"icon":""}]} |
Location: 00/15-05-061-04W6/5 | |
Location Alias: 00/15-05-61-04 W6M | |
Location Alias 2: 00/15-05-061-04 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 04 | |
Section: 05 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA KAKWA 15-5-61-4 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0412743 | |
License Date: 2009-09-29 | |
License Status: Issued | |
Spud Date: 2009-11-03 | |
Final Drill Date: 2009-11-23 | |
Well Total Depth: 3399.00 m | |
Surface Hole Latitude: 54.251811 | |
Surface Hole Longitude: -118.559706 |
Date | Event |
---|---|
2009-09-29 | Obtained License |
2009-11-03 | Lost Circulation Occurred |
2009-11-10 | Surface Casing Operation Performed |
2009-11-11 | Direction Drilling Operation Performed - Deviate |
2009-11-16 | Well Log Performed |
2009-11-17 | Intermediate Casing Operation Performed |
2009-11-23 | Finished Drilling |
2009-11-23 | Well Mode changed to Drilled and Cased |
2009-11-24 | Well Log Performed |
2009-11-25 | Production Casing Operation Performed |
2009-11-25 | Rig Released |
2009-11-25 | Well Log Performed |
2010-09-18 | Well Log Performed |
2010-09-19 | Perforation Treatment Performed - Jet Perforation |
2010-09-19 | Well Log Performed |
2010-09-20 | Perforation Treatment Performed - Fractured |
2010-09-20 | Perforation Treatment Performed - Jet Perforation |
2010-09-20 | Well Log Performed |
2010-09-21 | Perforation Treatment Performed - Fractured |
2010-09-22 | Perforation Treatment Performed - Jet Perforation |
2010-09-22 | Well Log Performed |
2010-09-23 | Perforation Treatment Performed - Fractured |
2010-09-24 | Perforation Treatment Performed - Jet Perforation |
2010-09-24 | Well Log Performed |
2010-09-25 | Perforation Treatment Performed - Fractured |
2010-09-25 | Perforation Treatment Performed - Jet Perforation |
2010-09-25 | Well Log Performed |
2010-09-26 | Perforation Treatment Performed - Fractured |
2010-09-26 | Perforation Treatment Performed - Jet Perforation |
2010-09-26 | Well Log Performed |
2010-09-27 | Perforation Treatment Performed - Fractured |
2010-09-27 | Perforation Treatment Performed - Jet Perforation |
2010-09-27 | Well Log Performed |
2010-09-28 | Perforation Treatment Performed - Fractured |
2010-10-28 | Well Structure changed to Commingled |
2012-08-06 | Well Log Performed |
2012-08-06 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-11 | 628.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-19 | Perforation | 3360.00 | 3362.00 | 20 |
2010-09-20 | Perforation | 3166.00 | 3167.00 | 10 |
2010-09-20 | Perforation | 3159.00 | 3160.00 | 10 |
2010-09-20 | Perforation | 3152.00 | 3153.00 | 10 |
2010-09-20 | Perforation | 3177.50 | 3178.50 | 10 |
2010-09-20 | Fracture | 3360.00 | 3362.00 | 0 |
2010-09-21 | Fracture | 3152.00 | 3167.00 | 0 |
2010-09-21 | Fracture | 3177.00 | 3178.50 | 0 |
2010-09-22 | Perforation | 3096.00 | 3097.00 | 10 |
2010-09-22 | Perforation | 3107.50 | 3109.00 | 10 |
2010-09-22 | Perforation | 3136.00 | 3136.50 | 10 |
2010-09-23 | Fracture | 3096.00 | 3136.50 | 0 |
2010-09-24 | Perforation | 3001.00 | 3002.00 | 10 |
2010-09-24 | Perforation | 2992.00 | 2993.00 | 10 |
2010-09-24 | Perforation | 3016.00 | 3017.00 | 10 |
2010-09-24 | Perforation | 3010.00 | 3011.00 | 10 |
2010-09-25 | Perforation | 2928.00 | 2930.00 | 20 |
2010-09-25 | Perforation | 2938.00 | 2940.00 | 20 |
2010-09-25 | Fracture | 2992.00 | 3017.00 | 0 |
2010-09-26 | Perforation | 2705.00 | 2706.00 | 10 |
2010-09-26 | Perforation | 2698.00 | 2698.50 | 10 |
2010-09-26 | Perforation | 2713.00 | 2714.00 | 10 |
2010-09-26 | Fracture | 2928.00 | 2940.00 | 0 |
2010-09-26 | Perforation | 2722.00 | 2723.00 | 10 |
2010-09-27 | Perforation | 2198.00 | 2198.50 | 10 |
2010-09-27 | Perforation | 2227.00 | 2230.00 | 10 |
2010-09-27 | Fracture | 2698.00 | 2723.00 | 0 |
2010-09-28 | Fracture | 2198.00 | 2230.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-11-03 | Lost Circulation | 52.00 | 333.00 |
2012-08-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]