If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495061504020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.238648,"lon":-114.811798,"icon":""}]} |
Location: 02/04-15-049-06W5/0 | |
Location Alias: 02/04-15-49-06 W5M | |
Location Alias 2: 02/04-15-049-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ 102 PEMBINA 4-15-49-6 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0448560 | |
License Date: 2012-09-19 | |
License Status: Issued | |
Spud Date: 2012-10-19 | |
Final Drill Date: 2012-10-26 | |
Well Total Depth: 3081.00 m | |
Surface Hole Latitude: 53.238648 | |
Surface Hole Longitude: -114.811798 |
Date | Event |
---|---|
2012-09-19 | Obtained License |
2012-10-19 | Surface Casing Operation Performed |
2012-10-21 | Direction Drilling Operation Performed - Deviate |
2012-10-21 | Well Log Performed |
2012-10-22 | Direction Drilling Operation Performed - Horizontal |
2012-10-22 | Intermediate Casing Operation Performed |
2012-10-23 | Intermediate Casing Operation Performed |
2012-10-26 | Finished Drilling |
2012-10-26 | Well Log Performed |
2012-10-26 | Well Mode changed to Drilled and Cased |
2012-10-27 | Liner Casing Operation Performed |
2012-10-28 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-28 | Rig Released |
2012-11-03 | Well Log Performed |
2012-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-10 | Well Began Production |
2012-11-10 | Well Fluid changed to Crude Oil |
2012-11-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-19 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-21 | 896.00 | Deviate (5 - 79 degrees) |
2012-10-22 | 1596.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-28 | Open Hole/Barefoot Completion | 3059.80 | 3081.00 | 0 |
2012-11-09 | Multi-Stage Fracture | 1739.80 | 1739.90 | 0 |
2012-11-09 | Multi-Stage Fracture | 1831.70 | 1831.80 | 0 |
2012-11-09 | Multi-Stage Fracture | 1923.60 | 1923.70 | 0 |
2012-11-09 | Multi-Stage Fracture | 2015.50 | 2015.60 | 0 |
2012-11-09 | Multi-Stage Fracture | 2107.40 | 2107.50 | 0 |
2012-11-09 | Multi-Stage Fracture | 2187.90 | 2188.00 | 0 |
2012-11-09 | Multi-Stage Fracture | 2268.50 | 2268.60 | 0 |
2012-11-09 | Multi-Stage Fracture | 2349.00 | 2349.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 2429.60 | 2429.70 | 0 |
2012-11-09 | Multi-Stage Fracture | 2510.20 | 2510.30 | 0 |
2012-11-09 | Multi-Stage Fracture | 2590.70 | 2590.80 | 0 |
2012-11-09 | Multi-Stage Fracture | 2671.30 | 2671.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2751.80 | 2751.90 | 0 |
2012-11-09 | Multi-Stage Fracture | 2832.40 | 2832.50 | 0 |
2012-11-09 | Multi-Stage Fracture | 2912.80 | 2912.90 | 0 |
2012-11-09 | Multi-Stage Fracture | 2993.30 | 2993.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 3055.40 | 3055.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 964 | 0.0 | 0.0 | 0.0 |
2013 | 8508 | 0.0 | 0.0 | 0.0 |
2014 | 8652 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8104 | 0.0 | 0.0 | 0.0 |
2017 | 8668 | 0.0 | 0.0 | 0.0 |
2018 | 8265 | 0.0 | 0.0 | 0.0 |
2019 | 7425 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-28 | No Incident Encountered | 0.00 | 0.00 |
2012-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]