If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144143202023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.211521,"lon":-111.880833,"icon":""}]} |
Location: 02/02-32-014-14W4/3 | |
Location Alias: 02/02-32-14-14 W4M | |
Location Alias 2: 02/02-32-014-14 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 14 | |
Section: 32 | |
County/Municipality: County of Newell | |
Well Name: TXNE 2V-32 ALDSON 2-32-14-14 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0431950 | |
License Date: 2011-02-28 | |
License Status: Suspension | |
Spud Date: 2011-03-08 | |
Final Drill Date: 2011-03-10 | |
Well Total Depth: 1090.00 m | |
Surface Hole Latitude: 50.211521 | |
Surface Hole Longitude: -111.880833 |
Date | Event |
---|---|
2011-02-28 | Obtained License |
2011-03-09 | Surface Casing Operation Performed |
2011-03-10 | Finished Drilling |
2011-03-10 | Well Log Performed |
2011-03-10 | Well Mode changed to Drilled and Cased |
2011-03-11 | Production Casing Operation Performed |
2011-03-11 | Well Log Performed |
2011-03-12 | Rig Released |
2011-05-02 | Well Log Performed |
2011-05-05 | Perforation Treatment Performed - Jet Perforation |
2011-05-14 | Perforation Treatment Performed - Jet Perforation |
2011-05-14 | Well Log Performed |
2011-05-15 | Perforation Treatment Performed - Jet Perforation |
2011-05-15 | Well Log Performed |
2011-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-06-12 | Perforation Treatment Performed - Jet Perforation |
2011-06-12 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2011-06-12 | Plug Back Performed |
2011-06-12 | Well Log Performed |
2011-06-14 | Perforation Treatment Performed - Fractured |
2011-07-24 | Perforation Treatment Performed - Jet Perforation |
2011-07-24 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2011-07-24 | Plug Back Performed |
2011-07-24 | Well Log Performed |
2011-09-18 | Perforation Treatment Performed - Jet Perforation |
2011-09-18 | Well Log Performed |
2011-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-30 | Perforation Treatment Performed - Jet Perforation |
2011-10-30 | Plug Back Performed |
2011-10-30 | Well Log Performed |
2011-10-30 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-05-05 | Perforation | 1055.00 | 1059.00 | 20 |
2011-05-05 | Perforation | 1051.00 | 1055.00 | 20 |
2011-05-14 | Perforation | 1039.00 | 1043.00 | 20 |
2011-05-14 | Perforation | 1035.00 | 1039.00 | 20 |
2011-05-15 | Perforation | 1028.00 | 1031.00 | 20 |
2011-05-19 | Acid Treatment | 1051.00 | 1059.00 | 0 |
2011-05-20 | Acid Treatment | 1035.00 | 1043.00 | 0 |
2011-05-20 | Acid Treatment | 1028.00 | 1031.00 | 0 |
2011-06-12 | Packing Dev Cpd w/Res-Gyp Cem | 1022.00 | 1025.00 | 0 |
2011-06-12 | Perforation | 1009.00 | 1012.00 | 20 |
2011-06-12 | Perforation | 1004.00 | 1006.50 | 20 |
2011-06-14 | Fracture | 1004.00 | 1012.00 | 0 |
2011-07-24 | Packing Dev Cpd w/Res-Gyp Cem | 999.50 | 1002.50 | 0 |
2011-07-24 | Perforation | 990.00 | 992.00 | 20 |
2011-09-18 | Perforation | 984.00 | 986.00 | 20 |
2011-09-18 | Perforation | 979.00 | 982.00 | 20 |
2011-10-30 | Perforation | 919.00 | 921.00 | 20 |
2011-10-30 | Packing Device Capped w/Cement | 967.00 | 975.00 | 0 |
For data sources see[4]