If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0646061016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.530618,"lon":-118.781507,"icon":""}]} |
Location: 00/16-10-064-06W6/0 | |
Location Alias: 00/16-10-64-06 W6M | |
Location Alias 2: 00/16-10-064-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 6 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: LONG RUN KAKWA 16-10-64-6 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0422991 | |
License Date: 2010-08-26 | |
License Status: Amended | |
Spud Date: 2010-09-17 | |
Final Drill Date: 2010-10-12 | |
Well Total Depth: 3288.00 m | |
Surface Hole Latitude: 54.530618 | |
Surface Hole Longitude: -118.781507 |
Date | Event |
---|---|
2010-08-26 | Obtained License |
2010-09-21 | Surface Casing Operation Performed |
2010-09-22 | Direction Drilling Operation Performed - Horizontal |
2010-09-28 | Intermediate Casing Operation Performed |
2010-10-12 | Finished Drilling |
2010-10-12 | Well Mode changed to Drilled and Cased |
2010-10-13 | Production Casing Operation Performed |
2010-10-14 | Rig Released |
2010-10-28 | Perforation Treatment Performed - Jet Perforation |
2010-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-11 | Perforation Treatment Performed - Jet Perforation |
2010-11-12 | Perforation Treatment Performed - Jet Perforation |
2010-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-13 | Perforation Treatment Performed - Jet Perforation |
2010-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-14 | Perforation Treatment Performed - Jet Perforation |
2010-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-15 | Perforation Treatment Performed - Jet Perforation |
2010-11-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-16 | Perforation Treatment Performed - Jet Perforation |
2010-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-18 | Perforation Treatment Performed - Jet Perforation |
2010-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-20 | Perforation Treatment Performed - Jet Perforation |
2010-11-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-25 | Well Began Production |
2010-11-25 | Well Fluid changed to Gas |
2010-11-25 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-09-22 | 273.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-28 | Perforation | 3268.00 | 3268.60 | 20 |
2010-11-10 | Multi-Stage Fracture | 3268.00 | 3268.60 | 0 |
2010-11-11 | Perforation | 3136.00 | 3136.60 | 17 |
2010-11-12 | Multi-Stage Fracture | 3136.00 | 3136.60 | 0 |
2010-11-12 | Perforation | 3000.00 | 3000.60 | 17 |
2010-11-13 | Multi-Stage Fracture | 3000.00 | 3000.60 | 0 |
2010-11-13 | Perforation | 2865.00 | 2865.60 | 17 |
2010-11-14 | Multi-Stage Fracture | 2865.00 | 2865.60 | 0 |
2010-11-14 | Perforation | 2734.00 | 2734.60 | 17 |
2010-11-15 | Multi-Stage Fracture | 2734.00 | 2734.60 | 0 |
2010-11-15 | Perforation | 2604.00 | 2604.60 | 17 |
2010-11-16 | Multi-Stage Fracture | 2604.00 | 2604.60 | 0 |
2010-11-16 | Perforation | 2431.00 | 2431.60 | 17 |
2010-11-16 | Multi-Stage Fracture | 2431.00 | 2431.60 | 0 |
2010-11-16 | Perforation | 2267.00 | 2267.60 | 17 |
2010-11-18 | Multi-Stage Fracture | 2267.00 | 2267.60 | 0 |
2010-11-18 | Perforation | 2091.00 | 2091.60 | 17 |
2010-11-20 | Multi-Stage Fracture | 2091.00 | 2091.60 | 0 |
2010-11-20 | Perforation | 1936.00 | 1936.60 | 17 |
2010-11-20 | Multi-Stage Fracture | 1936.00 | 1936.60 | 0 |
2010-11-20 | Perforation | 1763.00 | 1763.60 | 17 |
2010-11-21 | Multi-Stage Fracture | 1763.00 | 1763.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 670 | 0.0 | 0.0 | 0.0 |
2011 | 8094 | 0.0 | 0.0 | 0.0 |
2012 | 7824 | 0.0 | 0.0 | 0.0 |
2013 | 6857 | 0.0 | 0.0 | 0.0 |
2014 | 6757 | 0.0 | 0.0 | 0.0 |
2015 | 6908 | 0.0 | 0.0 | 0.0 |
2016 | 8386 | 0.0 | 0.0 | 0.0 |
2017 | 8444 | 0.0 | 0.0 | 0.0 |
2018 | 8686 | 0.0 | 0.0 | 0.0 |
2019 | 8605 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]