X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645170608002

Well Details

Well ID: 0645170608002
Loading map...
Location: 00/08-06-064-17W5/2
Location Alias: 00/08-06-64-17 W5M
Location Alias 2: 00/08-06-064-17 W5/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 17
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 8-6-64-17
Operator Name: Paramount Resources Ltd.
License Number: 0164713
License Date: 1994-02-03
License Status: Amended
Spud Date: 1994-02-19
Final Drill Date: 1994-02-25
Well Total Depth: 1777.00 m
Surface Hole Latitude: 54.507670
Surface Hole Longitude: -116.547127

For data sources see[1][2]

Well History

Date Event
1994-02-03 Obtained License
1994-02-20 Surface Casing Operation Performed
1994-02-25 Finished Drilling
1994-02-26 Well Log Performed
1994-02-27 Drill Stem Test Performed
1994-03-02 Drill Stem Test Performed
1994-03-04 Production Casing Operation Performed
1994-03-05 Rig Released
1995-02-14 Well Log Performed
1995-02-15 Perforation Treatment Performed - Jet Perforation
1995-02-16 Well Log Performed
1995-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-17 Plug Back Performed
1995-02-17 Well Log Performed
1995-02-18 Perforation Treatment Performed - Jet Perforation
1995-02-19 Well Log Performed
1995-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-20 Plug Back Performed
1995-02-20 Well Log Performed
1995-02-21 Perforation Treatment Performed - Jet Perforation
1995-02-22 Well Log Performed
1995-02-24 Perforation Treatment Performed - Fractured
1995-02-28 Well Log Performed
1995-03-01 Perforation Treatment Performed - Jet Perforation
1995-03-04 Perforation Treatment Performed - Fractured
1995-03-10 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-15 Perforation 1737.80 1740.00 14
1995-02-17 Packing Device Capped w/Cement 1733.00 1736.00 0
1995-02-18 Perforation 1727.50 1730.60 18
1995-02-20 Packing Device Capped w/Cement 1700.00 1708.00 0
1995-02-21 Perforation 1490.00 1492.00 18
1995-02-21 Perforation 1492.60 1497.30 18
1995-02-24 Fracture 1490.00 1497.30 0
1995-03-01 Perforation 1306.30 1307.70 18
1995-03-01 Perforation 1309.00 1310.80 18
1995-03-01 Perforation 1312.80 1314.20 18
1995-03-04 Fracture 1306.30 1314.20 0

For data sources see[4]



References