37-005-30634

Well Details

Well ID: 37-005-30634
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Madison Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: BALSIGER 2
License Status:
Spud Date:
Permit Date: 2010-05-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.963389
Longitude: -79.463444

For data sources see[1][2][3]

Well History

Date Event
2010-05-25 New Permit Application
2011-01-09 Performed Spud Operation
2011-01-14 Drilling Completion
2011-01-19 Perforation
2011-08-30 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 11,286.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 10,568.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 8,207.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 7,043.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 5,217.00 334 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 5,196.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 4,891.00 334 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 4,976.00 334 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 4,088.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 KRIEBEL MINERALS INC Drilling Fluid Waste 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 KRIEBEL MINERALS INC Fracing Fluid Waste 820.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1942464 Primary Facility 2011-01-11 Drilling/Alteration No Violations Noted
1943614 Primary Facility 2011-01-19 Routine/Complete Inspection No Violations Noted Drilling and stimulation appeared to have been completed and the well was flowing back into the above grade frac pit. E&S controls implemented as outlined in the E&S plan. Drill pit and frac pit both had more than the required two feet of lined freeboard. Operator should continue to monitor the erosion controls until site reclamation activities are completed.
1950036 Primary Facility 2011-02-15 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had not been final graded. Contacted operator representative Mark Hopkins regarding an area of silt fencing which had been compromised. Mr. Hopkins was to evaluate the site on 02/15/11. On 02/16/11 Mr. Hopkins contacted WQS Higgins and informed him that the compromised area was a result of improper fence installation after pipeline work. Mr. Hopkins stated that the silt fencing would be addressed this morning.
2082464 Primary Facility 2012-07-11 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation at the time of the inspection.

For data sources see[7]

References