Well ID: 37-003-22137 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.483528,"lon":-79.81725,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Penn Hills Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: BURLA 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-11 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.483528 | |
Longitude: -79.817250 |
Date | Event |
---|---|
2010-08-11 | New Permit Application |
2011-01-06 | Performed Spud Operation |
2011-01-18 | Drilling Completion |
2011-01-25 | Perforation |
2011-12-13 | NEWLY DRILLED |
2011-12-13 | REWORKED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 2,591.00 | 245 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 1,983.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 1,194.00 | 243 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 2,923.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 2,016.41 | 242 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 1,496.01 | 242 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 2,443.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 2,322.99 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 2,234.48 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Fracing Fluid Waste | 810.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 3,370.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2017 | PENNECO OIL CO INC | Produced Fluid | 11.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | PENNECO OIL CO INC | Produced Fluid | 11.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | PENNECO OIL CO INC | Produced Fluid | 16.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1947181 | Primary Facility | 2011-01-06 | Drilling/Alteration | No Violations Noted | USE RIG# 4 READY TO DRILL. PIT PROTECTED BY FENCING. PIT NOT LINED. |
1947188 | Primary Facility | 2011-01-07 | Drilling/Alteration | No Violations Noted | CONDUCTOR SANDED IN. USE RIG #4DRILLING AT 622'. SITE, PIT, E&S, AND ACCESS, OK. |
1947924 | Primary Facility | 2011-01-12 | Routine/Complete Inspection | No Violations Noted | On January 12th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Hay filter sock had been placed in behind the silt fence as an alternative to hay bales. A rip in the upper portion of the pit liner occurred the day earlier. The pit was drained and relined. No material escaped the drilling pit. The pit appears to be in good condition but its filling quickly. Water trucks were arriving on site at the time of inspection to begin hauling water away. |
1951160 | Primary Facility | 2011-01-14 | Routine/Complete Inspection | No Violations Noted | On January 14th, 2011 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The new pit liner appears to be intact and holding well. No spills, leaks, or accelerated erosion were observed during the inspection. |
1952972 | Primary Facility | 2011-01-20 | Routine/Complete Inspection | No Violations Noted | On January 20th, 2011 I conducted a routine inspection of the above site. Drilling was completed. Frac tanks were being moved in. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit is still in place and contains fluids. No spills, leaks, or accelerated erosion were observed during the inspection. |
1953926 | Primary Facility | 2011-01-11 | Drilling/Alteration | No Violations Noted | USE DRILLING AT 1890'. PIT LINER HAS ATEAR. DRILLING CEASED, THE PIT WAS DRAINED, AND A NEW LINER WAS INSTALLED. |
1953928 | Primary Facility | 2011-01-13 | Drilling/Alteration | No Violations Noted | USE RIG #4 IS DOWN FOR 7" CASING CEMENT TIME. PIT LINER HAS BEEN REPLACED FOR THE SECOND TIME. |
1953929 | Primary Facility | 2011-01-12 | Drilling/Alteration | No Violations Noted | USE DRILLING AT 1980'. SITE, PIT, E&S, AND ACCESS, OK. |
1954049 | Primary Facility | 2011-01-18 | Drilling/Alteration | No Violations Noted | APPALACHIA ON THE SITE TO CEMENT THE 4.5" CASING. |
1955523 | Primary Facility | 2011-01-26 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. |
1955699 | Primary Facility | 2011-01-24 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. TRUCKS FILLING FRAC TANKS. |
1957394 | Primary Facility | 2011-02-09 | Drilling/Alteration | No Violations Noted | WELL IS COMPLETE AND FRACED. |
1957855 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | On February 3rd, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit is still in place and contains fluids. The liner appears to be in good condition and the pit had adequate freeboard. No spills, leaks, or accelerated erosion were observed during the inspection. |
1957902 | Primary Facility | 2011-02-08 | Routine/Complete Inspection | No Violations Noted | On February 8th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The pit is still in place and contains fluids. The liner appears to be in good condition and the pit had adequate freeboard. No spills, leaks, or accelerated erosion were observed during the inspection. |
1958909 | Primary Facility | 2011-02-25 | Routine/Complete Inspection | No Violations Noted | On February 25th, 2011 I conducted a routine inspection of the above site. Drilling and frac were completed and the well was equipped for production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The pipeline was being installed. All E&S controls were in place and constructed according to the plan at site. The pit is still in place and contains fluids. The liner appears to be in good condition and the pit had adequate freeboard. No spills, leaks, or accelerated erosion were observed during the inspection. |
1981543 | Primary Facility | 2011-05-11 | Drilling/Alteration | No Violations Noted | WELL COMPLETE AND HOOKED UP. ANNULUS IS OPEN. |
1983663 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | No Violations Noted | On April 19th, 2011 I conducted a routine inspection of the above site. The well was in production. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The pit was closed and the site grading has begun. No spills, leaks, or accelerated erosion were observed during the inspection. A well tag identifying the operator and permit number needs secured to the well. |
1993784 | Primary Facility | 2011-07-21 | Drilling/Alteration | No Violations Noted | THIS GAS WELL IS HOOKED UP AND PRODUCING. THE SITE IS NOT RESTORED. THE PIT IS GONE AND THE ACCESS IS STONED. |
2107689 | Primary Facility | 2012-10-16 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, the well site sign and label were on site. The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. There were no erosion or sedimentation issues. The area around the pad was restored and meets the 70% uniform vegetative coverage. |
2134529 | Primary Facility | 2013-01-16 | Routine/Complete Inspection | No Violations Noted | THIS IS A WELL MAINTAINED OIL AND GAS WELL. THE SITE IS RESTORED. |
For data sources see[7]