If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-21754 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.443817,"lon":-76.916778,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Cascade Township | |
| Operator Name: ARD OPR LLC | |
| Well Pad ID: 155240 | |
| Farm/Lease Name: MAC NORTH B-1H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2018-09-17 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.443817 | |
| Longitude: -76.916778 |
| Date | Event |
|---|---|
| 2018-09-17 | New Permit Application |
| 2018-10-26 | Performed Spud Operation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2019 | ARD OPR LLC | 1,101,623.50 | 64 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2018 | ARD OPR LLC | Drill Cuttings | 21.13 Tons | LANDFILL | 100955 |
| 2019 | ARD OPR LLC | Other Oil & Gas Wastes | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2019 | ARD OPR LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2019 | ARD OPR LLC | Drilling Fluid Waste | 440.00 Bbl | REUSE (AT WELL PAD) | |
| 2019 | ARD OPR LLC | Synthetic Liner Materials | 3.98 Tons | LANDFILL | 301358 |
| 2019 | ARD OPR LLC | Drill Cuttings | 2,093.49 Tons | LANDFILL | 301358 |
| 2019 | ARD OPR LLC | Waste Water Treatment Sludge | 5.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2019 | ARD OPR LLC | Synthetic Liner Materials | 8.34 Tons | LANDFILL | 100955 |
| 2019 | ARD OPR LLC | Drill Cuttings | 6.49 Tons | LANDFILL | 100955 |
| 2019 | ARD OPR LLC | Unused Fracturing Fluid Waste | 50.00 Bbl | LANDFILL | 100955 |
| 2019 | ARD OPR LLC | Servicing Fluid | 31.25 Bbl | REUSE (AT WELL PAD) | |
| 2019 | ARD OPR LLC | Produced Fluid | 2,813.56 Bbl | REUSE (AT WELL PAD) | |
| 2019 | ARD OPR LLC | Other Oil & Gas Wastes | 557.85 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2785197 | Primary Facility | 2018-10-05 | Routine/Complete Inspection | No Violations Noted | The pad and site remains under construction. An under drain is clearly seen during this inspection ( see photo). Site stable. No erosion. |
| 2798706 | Primary Facility | 2018-11-06 | Drilling/Alteration | No Violations Noted | Surface hole rig drilling conductor for permitted wells. All cuttings being disposed of properly. All containers within secondary containment. No issues noted. |
| 2804377 | Primary Facility | 2018-11-13 | Drilling/Alteration | No Violations Noted | |
| 2806702 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | Weather was 35° and cloudy at time of inspection. There were no Alta representatives on location at time of inspection. Well was a spud conductor only. Conductor casing was set and cemented in place. The casing had a steel plate welded over the top at time of inspection. Well cellar rings were installed. No violations were noted at time of inspection. |
| 2824638 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | I met Bill Mitchell of ARD when I arrived. H&P rig 225 on location, running 9 5/8 casing in the 1H well. Containments appeared to be in good condition. On the south side of the pad, I noted several small puddles with a blue tint that had a soapy foam on them. The rig was being washed at the time, making it likely that this was rig wash water escaping containment. I also noted a pump just off of the east side of the containment that had a light spattering of a red substance frozen in the ice next to it. When I showed these areas to Bill, he noted that the red substance was likely diesel fuel, and told me he would have both areas cleaned up. I also pointed out to Bill a pallet of bags of citric acid that were not in containment, and he told me he would see to it that they were placed in containment. Some water (1-2") had built up around the edges of the containment, and Bill said he would have these areas vacced. |
| 2827892 | Primary Facility | 2019-01-14 | Routine/Complete Inspection | No Violations Noted | Weather was 16° and sunny at time of inspection. Met with Alta representative Bill Mitchell on location. This well recently had its surface and intermediate casing drilled and cemented. Reviewed the daily activity reports and the cement job logs from each string and no discrepancies were noted at time of inspection. Well was closed in with a nightcap and covered with rig matting at time of inspection. The rig was drilling the lateral section of the 4H well. Once the 4H is completed the rig intends on moving to the 3H to complete it. |
| 2839916 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Alta representative Bill Mitchell on location. This well had its surface and intermediate casings drilled and cemented. The well was closed in with a nightcap and covered by the catwalk at time of inspection. This well is next and last to be completed on this location. No violations noted at time of inspection. |
| 2840569 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | I met RD Mann when I arrived. H&P 225 rig on site, drilling at 14800' on the 2B well. Snow and ice cover on containment, but berms appear to be in good condition. The area under the rig shakers had an accumulation of oily water, as did the area behind the mud tanks. I recommended to RD that he have these areas vacced. Chemical containment was sound, although snow had accumulated in it. |
| 2843183 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | Weather was 29 degrees and sunny. Met with Alta representative R.D. Mann. Well has its surface and intermediate casing cemented. This well will be completed after the 2H. Well was closed in with a night cap and cover with rig equipment at time of inspection. No violations noted at time of inspection. |
| 2852927 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30 degrees and sunny. Met with Alta representative Bill Mitchell on location. Rig was currently drilling the 8 3/4' hole. They were currently at a depth of 2388'. The estimated TD is 19874'. No violations at time of inspection. |
For data sources see[7]