If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28461 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.176722,"lon":-79.702028,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148513 | |
Farm/Lease Name: HEPLER UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.176722 | |
Longitude: -79.702028 |
Date | Event |
---|---|
2010-11-02 | New Permit Application |
2010-11-16 | Performed Spud Operation |
2011-04-11 | Drilling Completion |
2011-06-21 | Perforation |
2013-10-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-28 | 2011-06-28 | 8,206 | 5,734,383 | |
2 | 2011-06-28 | 2011-06-28 | 7,124 | 5,734,383 | |
3 | 2011-06-28 | 2011-06-28 | 8,206 | 5,734,383 | |
4 | 2011-06-28 | 2011-06-28 | 7,124 | 5,734,383 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00725000 | |
Proppant (lbs) | Proppant | 100.00 | 10.77 | |||||
9.69 | 10.77 | |||||||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Carbohydrates | 95.00 | 0.00005000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00001000 | |||||
GBL | Clearwater International | Gel Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00185000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 90.31 | 100.00 | |||||
100.00 | 90.31 | |||||||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00780000 | ||
Iron Control A | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00684000 | ||
Unislik ST 50 | CESI Chemical | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
Biocide EC 6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00803000 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00124000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00134000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00746000 | |||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.26 | |||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.28 | |||||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00684000 | ||
CMHPG | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | 100.00 | 0.00172000 | |||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 311,855.00 | 67 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 1,013,903.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 635,748.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 449,455.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 341,365.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 306,951.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 289,434.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 257,455.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 221,804.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,665.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,663.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 48,182.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,812.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,608.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 275.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 906.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 735.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,538.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 315.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 680.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 810.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,787.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,246.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.30 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,981.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 46.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,000.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 618.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 347.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 332.02 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,616.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 221.67 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 111.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil | 0.08 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 74.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.08 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 661.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 216.66 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 396.67 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1954916 | Primary Facility | 2011-02-18 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site. |
1960338 | Primary Facility | 2011-03-22 | Drilling/Alteration | No Violations Noted | HORIZONAL MARCELLUS |
1965002 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site. Windy and rainy. |
1977254 | Primary Facility | 2011-05-26 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site. James and Wade were on site representing Chevron. Jason Brannan DEP was also present. |
2038269 | Primary Facility | 2012-01-31 | Routine/Complete Inspection | No Violations Noted | |
2072630 | Primary Facility | 2012-06-04 | Site Restoration | No Violations Noted | Site restoration inspection. No issues noted. |
2072636 | Primary Facility | 2012-06-04 | Site Restoration | No Violations Noted | |
2153992 | Primary Facility | 2013-04-05 | Complaint Inspection | No Violations Noted | Met with Matt Reager with Chevron on site concerning a citezen complaint on a Chevron Lease. Observed E&S issues on site that need to be addressed. |
2157228 | Primary Facility | 2013-04-16 | Follow-up Inspection | No Violations Noted | On 4/16/13 Sam Steingrabe conducted a follow up inspection at this site. Please read the above.Chevron repaired the erosional channel as requested. The repair looked great. |
2365109 | Primary Facility | 2015-04-28 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be in sound condition. The site appaeres to be restored with good vegetative growth. No observation of accelerted erosion or sedmintaiton in realtion to the access road or well site. |
2474610 | Primary Facility | 2016-04-13 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the access road or well site. See inspection #2474609 for additional observations regarding the site. |
2558594 | Primary Facility | 2017-02-02 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the access road or well site. |
For data sources see[8]