If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24331 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.020536,"lon":-79.678142,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149688 | |
Farm/Lease Name: GEORGE F JOSEPH 11H | |
License Status: Active | |
Spud Date: 2010-06-20 | |
Permit Date: 2010-03-15 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.020536 | |
Longitude: -79.678142 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 17,878.00 | 10 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 784,436.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 422,732.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 309,025.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 234,323.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 200,592.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 124,450.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 128,812.61 | 352 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 138,854.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 19,835.00 | 80 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 1,322.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 3,996.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 530.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2012 | XTO ENERGY INC | Produced Fluid (in Barrels) | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid (in Barrels) | 564.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid (in Barrels) | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid (in Barrels) | 1,108.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid (in Barrels) | 511.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid (in Barrels) | 49.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Produced Fluid (in Barrels) | 359.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid (in Barrels) | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid (in Barrels) | 384.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid (in Barrels) | 99.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid (in Barrels) | 105.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid (in Barrels) | 368.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 199.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 133.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 213.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1894507 | Primary Facility | 2010-06-25 | Drilling/Alteration | No Violations Noted | |
1916591 | Primary Facility | 2010-09-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT, |
1938184 | Primary Facility | 2010-09-05 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PHOENIX # 5 COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION. |
For data sources see[6]