37-005-29341

Well Details

Well ID: 37-005-29341
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Gilpin Township
Operator Name: BAKER GAS INC
Well Pad ID:
Farm/Lease Name: JAMES A QUARATO 1
License Status: Active
Spud Date: 2009-07-23
Permit Date: 2007-08-16
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.693747
Longitude: -79.581615

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 BAKER GAS INC 4,144.00 97 0.00 0 0.00 0
2010 BAKER GAS INC 10,882.00 210 0.00 0 0.00 0
2011 BAKER GAS INC 13,473.00 293 0.00 0 0.00 0
2012 BAKER GAS INC 5,549.00 166 0.00 0 0.00 0
2013 BAKER GAS INC 9,051.00 300 0.00 0 0.00 0
2014 BAKER GAS INC 9,905.00 360 0.00 0 0.00 0
2015 BAKER GAS INC 5,267.00 365 0.00 0 0.00 0
2016 BAKER GAS INC 9,385.00 363 0.00 0 0.00 0
2017 BAKER GAS INC 6,776.00 299 0.00 0 0.00 0
2018 BAKER GAS INC 5,303.00 334 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1816392 Primary Facility 2009-07-29 Routine/Complete Inspection Violation(s) Noted Drilling was commenced on or about 07/23/09. Drilling was ongoing at the time of the inspection. No accelerated erosion was observed in relation to the access road. Below grade pit had more than the two feet of required freeboard. Noted that the filter fabric fencing had not been installed properly along the whole length of the fence. Portions had not been properly trenched , the separate sections of fencing had not been properly joined when they were installed, and a small plastic culvert had been installed and run under the filter fabric fence. The small culvert pipe was installed after a spring was encountered during site construction. Proper erosion contorls were not implemented to isolate the spring flow from the disturbed earth and mi nimize accelerated erosion & sedimentation. All of these instances have allowed off-site transport of sediment due to recent precipitation. Additionaly the brush generated while clearing the site had been placed outside of the erosion control BMP's.
1865045 Primary Facility 2009-08-18 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1816392 568048 07/29/2009 2009-07-29 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
568048 248479 NOV - Notice of Violation Comply/Closed 2009-08-18

For data sources see[5]