X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-23224

Well Details

Well ID: 37-125-23224
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Canton Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 149527
Farm/Lease Name: WARD HAROLD UNIT 2H
License Status: Active
Spud Date: 2008-08-08
Permit Date: 2008-06-17
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.228690
Longitude: -80.321749

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 0.00 0 0.00 0 0.00 0
2009 0.00 0 0.00 0 0.00 0
2010 RANGE RESOURCES APPALACHIA LLC 426,421.92 366 2,421.23 182 1,301.00 184
2011 RANGE RESOURCES APPALACHIA LLC 221,593.00 314 1,091.53 169 518.00 145
2012 RANGE RESOURCES APPALACHIA LLC 190,788.82 366 0.00 0 757.42 366
2013 RANGE RESOURCES APPALACHIA LLC 171,991.41 364 0.00 0 766.45 364
2014 RANGE RESOURCES APPALACHIA LLC 147,651.06 362 0.00 0 607.74 362
2015 RANGE RESOURCES APPALACHIA LLC 116,215.97 361 0.00 0 440.22 361
2016 RANGE RESOURCES APPALACHIA LLC 110,594.10 363 0.00 0 271.24 363
2017 RANGE RESOURCES APPALACHIA LLC 94,644.20 357 0.00 0 212.86 357
2018 RANGE RESOURCES APPALACHIA LLC 86,608.31 328 0.00 0 158.85 297
2019 RANGE RESOURCES APPALACHIA LLC 20,752.33 88 0.00 0 48.20 88

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Drilling Fluid Waste (in Barrels) 2,500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Drilling Fluid Waste (in Barrels) 27,200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WV-0014
2010-A01 Produced Fluid (in Barrels) 2,500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Produced Fluid (in Barrels) 4,486.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Drilling Fluid Waste (in Barrels) 1,250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Drilling Fluid Waste (in Barrels) 13,600.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WV-0014
2010-S01 Produced Fluid (in Barrels) 1,250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Produced Fluid (in Barrels) 2,243.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S02 Produced Fluid (in Barrels) 448.74 Bbl INJECTION DISPOSAL WELL 34-133-21076
2010-S02 Produced Fluid (in Barrels) 935.19 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011-S01 Produced Fluid (in Barrels) 107.74 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-S01 Produced Fluid (in Barrels) 130.26 Bbl INJECTION DISPOSAL WELL 34-133-21076
2011-S01 Produced Fluid (in Barrels) 194.90 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011-S02 Produced Fluid (in Barrels) 45.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011-S02 Produced Fluid (in Barrels) 45.93 Bbl INJECTION DISPOSAL WELL 34-133-21076
2011-S02 Produced Fluid (in Barrels) 55.12 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011-S02 Produced Fluid (in Barrels) 268.86 Bbl INJECTION DISPOSAL WELL 34-151-22783
2011-S02 Produced Fluid (in Barrels) 4,880.52 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 50.10 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012-S01 Produced Fluid (in Barrels) 1,621.62 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 44.25 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012-S02 Produced Fluid (in Barrels) 15.03 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012-S02 Produced Fluid (in Barrels) 45.10 Bbl INJECTION DISPOSAL WELL 34-151-22783
2012-S02 Produced Fluid (in Barrels) 2,660.64 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 957.93 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 278.06 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013-S02 Produced Fluid (in Barrels) 753.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 108.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-S01 Produced Fluid (in Barrels) 580.72 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 118.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2014-S02 Produced Fluid (in Barrels) 453.12 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 172.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-S01 Produced Fluid (in Barrels) 356.57 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 151.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015-S02 Produced Fluid (in Barrels) 45.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2015-S02 Produced Fluid (in Barrels) 288.29 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 113.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S01 Produced Fluid (in Barrels) RWC 802 113.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-S01 Produced Fluid (in Barrels) RWC 802 514.52 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 57.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Produced Fluid (in Barrels) RWC 802 59.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 455.82 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 55.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 21.43 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 37.99 Bbl REUSE (AT WELL PAD)
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 8.35 Bbl REUSE (AT WELL PAD)
2017-M03 Produced Fluid (in Barrels) RWC 802 52.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 30.47 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 55.11 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 57.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 55.11 Bbl REUSE (AT WELL PAD)
2017-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 21.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M07 Produced Fluid (in Barrels) RWC 802 35.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 27.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 19.29 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 25.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M09 Produced Fluid (in Barrels) RWC 802 57.53 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 77.37 Bbl REUSE (AT WELL PAD)
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 22.50 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 52.19 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 55.53 Bbl REUSE (AT WELL PAD)
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 19.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M01 Produced Fluid (in Barrels) RWC 802 33.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 61.07 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 81.41 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 50.10 Bbl REUSE (AT WELL PAD)
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 14.19 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 44.25 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 55.11 Bbl REUSE (AT WELL PAD)
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 30.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 22.13 Bbl REUSE (AT WELL PAD)
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 12.50 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 25.47 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Tons) RWC 802 3.35 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 51.50 Bbl REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 36.50 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 116.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 26.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 30.90 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 34.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M11 Produced Fluid (in Barrels) RWC 802 83.07 Bbl REUSE (AT WELL PAD)
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 39.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M12 Produced Fluid (in Barrels) RWC 802 17.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M12 Produced Fluid (in Barrels) RWC 802 43.00 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 53.86 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 34.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 25.88 Bbl REUSE (AT WELL PAD)
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 26.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 26.72 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1851391 Primary Facility 2009-12-02 Routine/Complete Inspection No Violations Noted WELL HAS WRONG API # ON TAG- Tag reads 125-27502, Well Completed, Pit lined, open and fenced. Site in good shape
1885468 Primary Facility 2010-05-13 Routine/Complete Inspection No Violations Noted On May 13, 2010 I visited this site in response to a restoration extension request submitted by the operator on 3/15/2010. Also on site was Range Resources E&S Supervisor Jeremy Matinko. TD was reached on 5/28/09. The drilling pits are open but have been solidified. The pits should closed as soon as possible. E&S controls were still in place and functioning. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site has reached uniform 70% vegetative cover. The extension is approved. The deadline for restoration is August 28, 2010.
2008518 Primary Facility 2011-08-24 Complaint Inspection No Violations Noted
2173407 Primary Facility 2013-05-23 Routine/Complete Inspection No Violations Noted
2219896 Primary Facility 2013-10-11 Routine/Complete Inspection No Violations Noted

For data sources see[6]

References