X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22393

Well Details

Well ID: 37-115-22393
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154612
Farm/Lease Name: MOORE, S. 4
License Status: Active
Spud Date: 2018-05-22
Permit Date: 2017-10-31
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.787364
Longitude: -75.957844

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-20 2018-09-24 6565 28,145,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00267675 7181.54
Water 7732-18-5 95 0.0169527 45483.1
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.5442 234,875,000.0
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000670367 1798.55
Acetic acid 64-19-7 5 0.000111728 299.759
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0363699 97578.1
Water 7732-18-5 7.5 0.018185 48789
Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000158989 426.557
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007949 213.278
Cinnamaldehyde 104-55-2 10 0.00007949 213.278
Ethylene glycol 107-21-1 40 0.000317978 853.113
formic acid 64-18-6 10 0.00007949 213.278
isoproyl alcohol 67-63-0 5 0.00003975 106.639
Ethoxylated alcohol 68131-39-5 10 0.00007949 213.278
Other Chemical(s) Listed Above See Trade Name(s) List Glutaral 111-30-8 26.7 0.00233609 6267.58
formic acid 64-18-6 10 0.00007949 213.278
didecyldimethylammonium chloride 7173-51-5 8 0.000697327 1870.88
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204134 54767.8
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000158989 426.557
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007949 213.278
isoproyl alcohol 67-63-0 5 0.00003975 106.639
Ammonium Chloride 12125-02-9 1.5 0.00153101 4107.59
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102067 2738.39
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000464593 1246.47
organic phosphonic salts 15827-60-8 15 0.00267675 7181.54
Water 7732-18-5 7.5 0.018185 48789
oleic acid diethanolamide 93-83-4 1.5 0.00153101 4107.59
Cinnamaldehyde 104-55-2 10 0.00007949 213.278
Ethoxylated alcohol 68131-39-5 10 0.00007949 213.278
ethanal 64-17-5 2.8 0.000244983 657.274
Citric acid 77-92-9 30 0.000670367 1798.55
Biocide, MBC-516 Keane Biocide ethanal 64-17-5 2.8 0.000244983 657.274
Glutaral 111-30-8 26.7 0.00233609 6267.58
didecyldimethylammonium chloride 7173-51-5 8 0.000697327 1870.88
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000464593 1246.47
Water 7732-18-5 56.7 0.00496266 13314.5
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.0817 32,414,300.0
Friction Reducer, KFR-16FW Keane Friction Reducer Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204134 54767.8
Ammonium Chloride 12125-02-9 1.5 0.00153101 4107.59
oleic acid diethanolamide 93-83-4 1.5 0.00153101 4107.59
Water 7732-18-5 60 0.0612402 164304
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102067 2738.39

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,922,709.00 75 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,928,118.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M06 Drill Cuttings (in Tons) RWC 810 356.47 Tons LANDFILL 101247
2018-M06 Synthetic Liner Materials (in Tons) RWC 806 3.20 Tons LANDFILL 101247
2018-M07 Drill Cuttings (in Tons) RWC 810 1,297.78 Tons LANDFILL 101247
2018-M08 Synthetic Liner Materials (in Tons) RWC 806 12.69 Tons LANDFILL 101247
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M09 Synthetic Liner Materials (in Tons) RWC 806 0.73 Tons LANDFILL 101247
2018-M09 Unused Fracturing Fluid Waste (in Tons) RWC 805 2.43 Tons LANDFILL 101247
2018-M09 Waste Water Treatment Sludge (in Tons) RWC 804 9.53 Tons REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Tons) RWC 899 0.10 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M10 Produced Fluid (in Barrels) RWC 802 26,405.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M10 Synthetic Liner Materials (in Tons) RWC 806 13.20 Tons LANDFILL 101247
2018-M10 Waste Water Treatment Sludge (in Tons) RWC 804 111.55 Tons REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 15,089.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 5.63 Tons LANDFILL 101247
2018-M11 Waste Water Treatment Sludge (in Tons) RWC 804 41.56 Tons REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 5,892.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M12 Produced Fluid (in Barrels) RWC 802 56.33 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 3,511.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M01 Produced Fluid (in Barrels) RWC 802 257.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M02 Produced Fluid (in Barrels) RWC 802 2,510.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M03 Produced Fluid (in Barrels) RWC 802 2,193.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2733204 Primary Facility 2018-05-21 Preoperation Inspection No Violations Noted Casey Baldwin and I performed a preop inspection on the Moore S pad. The perimeter BMPs were all in place and operational, despite recent torrential rains. The pad was under construction at the time of inspection. The RCE was in place as was the entrance culvert. The tank pad was not constructed yet however the perimeter BMPs were all installed. I approve this preoperational inspection. The wells associated with this site are the 115-22392- 115-22393, 115-22394 and 115-22395.

There were no violations.

2734684 Primary Facility 2018-05-23 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Larry Cheatwood. United Drilling was on site to drill and run the conductor pipe for the 2H, 4H, 6H and 8H wells. The 2H was at TD at 103'. There was an auger rig on the 4H at a depth of 20'. The 6H was at a depth of 46'. There was an air rig on the 8H at a depth of 84'. The TD for all the wells will be 103'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2750097 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Larry Cheatwood. Nabors X36 rig was on site and drilling the lateral section of the well. There are four wells on site to be drilled, the surface and intermediate casings have been drilled and set on all four wells. They are drilling the hole for the production casing on the second well out of the four. They are drilling with DOBM. The proposed TD for the well is 19744'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2771562 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Steve Barrett and Larry Fulmer. Keane was on site to frac the 2H, 4H, 6H and 8H wells. They were stimulating stage 32 out of 66 stages on the 8H and running a plug and perf in the 4H when I arrived on site. There were 23 stages completed out of 59 on the 2H. There were 29 stages completed out of 67 on the 4H. There were 32 stages completed out of 70 on the 6H. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2805972 Primary Facility 2018-11-21 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going to a 500bbl tank on containment and the containment appeared to be in good condition. There were 16 empty 500bbl tanks that were used during the frac, 12 of those tanks were cleaned and not on containment and the other 4 tanks were on containment and the containment appeared to be in good condition.

For data sources see[7]

References