X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21325

Well Details

Well ID: 37-081-21325
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Lewis Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 150186
Farm/Lease Name: DCNR 100 46H 50860
License Status: Active
Spud Date: 2013-10-19
Permit Date: 2013-09-30
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.434475
Longitude: -77.038742

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-20 2014-07-26 8916 6,187,020.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MBC 516 Trican Biocide N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00052777 0
Glutaraldehyde 111-30-8 27 0.00259087 0
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00079645 0
Ethanol 64-17-5 2.8 0.00026868 0
FEAC 20 Trican Iron Control Acetic acid 64-19-7 50 0.00075029 0
Citric acid 77-92-9 30 0.00045018 0
Proppant 40/70 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.19619 0
Sl-7 Trican Scale Inhibitor Ethylene glycol 107-21-1 30 0.00822898 0
7.5% HydroChloric Acid Trican Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0739527 0
FR-15 Trican Friction Reducer Proprietary Amide Proprietary 2.5 0.0022771 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 25 0.022771 0
Proppant 30/50 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 4.98955 0
AL-7NR Trican Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00002119 0
Proppant 80/100 Oklahoma Trican Proppant Silica 14808-60-7 100 0.798547 0
Water Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 88.9031 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2014 SENECA RESOURCES CO LLC 740,455.40 86 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 1,894,706.72 363 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 1,254,644.72 278 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 966,570.41 355 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 670,813.97 363 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 136,662.92 88 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2013-S02 Drill Cuttings (in Tons) 81.85 Tons LANDFILL 301358
2013-S02 Drill Cuttings (in Tons) 1,162.56 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2014-S02 Produced Fluid (in Barrels) 28.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014-S02 Produced Fluid (in Barrels) 10.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014-S02 Produced Fluid (in Barrels) 8.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC012
2014-S02 Produced Fluid (in Barrels) 98.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014-S02 Produced Fluid (in Barrels) 7,905.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 132.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015-S01 Produced Fluid (in Barrels) 33.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015-S01 Produced Fluid (in Barrels) 2,621.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Drilling Fluid Waste (in Barrels) 72.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-S02 Fracing Fluid Waste (in Barrels) 1,008.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-S02 Produced Fluid (in Barrels) 873.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015-S02 Produced Fluid (in Barrels) 360.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M01 Produced Fluid (in Barrels) RWC 802 165.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M02 Produced Fluid (in Barrels) RWC 802 152.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M03 Produced Fluid (in Barrels) RWC 802 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M04 Produced Fluid (in Barrels) RWC 802 102.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M05 Produced Fluid (in Barrels) RWC 802 63.89 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M06 Produced Fluid (in Barrels) RWC 802 102.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M07 Produced Fluid (in Barrels) RWC 802 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M07 Produced Fluid (in Barrels) RWC 802 23.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M08 Produced Fluid (in Barrels) RWC 802 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M09 Produced Fluid (in Barrels) RWC 802 107.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M10 Produced Fluid (in Barrels) RWC 802 27.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M11 Produced Fluid (in Barrels) RWC 802 108.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-M12 Produced Fluid (in Barrels) RWC 802 69.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M01 Produced Fluid (in Barrels) RWC 802 62.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M01 Produced Fluid (in Barrels) RWC 802 25.00 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 62.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M03 Produced Fluid (in Barrels) RWC 802 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M03 Produced Fluid (in Barrels) RWC 802 66.00 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 14.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M04 Produced Fluid (in Barrels) RWC 802 69.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 74.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M05 Produced Fluid (in Barrels) RWC 802 13.00 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 76.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 27.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M07 Produced Fluid (in Barrels) RWC 802 25.50 Bbl REUSE (AT WELL PAD)
2017-M07 Synthetic Liner Materials (in Tons) RWC 806 4.78 Tons LANDFILL 301358
2017-M10 Produced Fluid (in Barrels) RWC 802 83.33 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 57.78 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 41.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M12 Produced Fluid (in Barrels) RWC 802 14.44 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 43.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M01 Produced Fluid (in Barrels) RWC 802 27.22 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 14.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M02 Produced Fluid (in Barrels) RWC 802 14.44 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 31.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M03 Produced Fluid (in Barrels) RWC 802 12.78 Bbl REUSE (AT WELL PAD)
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 12.22 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M04 Produced Fluid (in Barrels) RWC 802 24.44 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 31.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M05 Produced Fluid (in Barrels) RWC 802 11.11 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 44.44 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M07 Produced Fluid (in Barrels) RWC 802 14.44 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 64.44 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 57.78 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 57.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M11 Produced Fluid (in Barrels) RWC 802 72.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M12 Produced Fluid (in Barrels) RWC 802 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M12 Produced Fluid (in Barrels) RWC 802 32.50 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 25.56 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 14.44 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 14.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2019-M03 Produced Fluid (in Barrels) RWC 802 28.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2240326 Primary Facility 2014-01-27 Drilling/Alteration No Violations Noted
2601607 Primary Facility 2017-05-18 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. Well tag noted as being incorrect in inspection report. No violations noted at time of inspection.
2713793 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/26/2018.

At the time of the inspection, 9 wells were in production. The PCSM has been implemented but is not functioning as designed. The fresh water impoundment has been removed and the area reclaimed. I recommend reviewing the implementation of the PCSM. No violations noted.

2810184 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted Nine wells staged for production. Nine GPUs within 10 inch polyurethane coated Styrofoam containment. No leaks from production equipment.

A well site restoration period extension request was submitted on 10/26/2018. The request will be returned due to PCSM issues.

For data sources see[7]

References