X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45083

Well Details

Well ID: 37-121-45083
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Rockland Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: MASTERS WEST 2983
License Status: Active
Spud Date: 2013-05-22
Permit Date: 2012-12-11
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.314708
Longitude: -79.626628

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 0.00 0 0.00 0 0.00 0
2014 CATALYST ENERGY INC 0.00 0 100.31 365 0.00 0
2015 CATALYST ENERGY INC 0.00 0 52.97 30 0.00 0
2016 CATALYST ENERGY INC 0.00 0 35.96 61 0.00 0
2017 CATALYST ENERGY INC 0.00 0 33.00 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 39.49 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2016-A00 Produced Fluid (in Barrels) RWC 802 119.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017-A00 Produced Fluid (in Barrels) RWC 802 239.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017-A00 Produced Fluid (in Barrels) RWC 802 3.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-A00 Produced Fluid (in Barrels) RWC 802 18.33 Bbl ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 66.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2169928 Primary Facility 2013-05-21 Routine/Complete Inspection No Violations Noted
2176911 Primary Facility 2013-06-20 Administrative/File Review No Violations Noted
2177272 Primary Facility 2013-06-21 Routine/Complete Inspection No Violations Noted
2178311 Primary Facility 2013-06-20 Routine/Complete Inspection No Violations Noted
2200523 Primary Facility 2013-08-29 Site Restoration No Violations Noted
2204170 Primary Facility 2013-09-10 Site Restoration No Violations Noted
2230160 Primary Facility 2013-12-17 Routine/Complete Inspection No Violations Noted
2315570 Primary Facility 2014-10-21 Site Restoration No Violations Noted

For data sources see[6]

References