37-021-20842

Well Details

Well ID: 37-021-20842
Loading map...
Operator Name: T & F EXPLORATION LP
First Permit Date: 1993-04-30
Last Permit Date: 1993-04-30
Spud Date: 1993-05-19
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.402466
Longitude: -78.773249

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 8795.0 365.0 0.0 0.0 0.0 0.0
2010-0 4063.0 365.0 0.0 0.0 0.0 0.0
2009-0 4713.0 182.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
215336 1993-04-28 No Violations Noted WETLANDS DETERM.
215389 1993-05-26 No Violations Noted AT 1675'; E&S, PIT OK
215409 1993-06-04 No Violations Noted KILLING WELL; E&S, PIT OK
215421 1993-06-14 No Violations Noted E&S, PITS OK
215426 1993-06-21 No Violations Noted CLEANING OUT; E&S, PIT OK
215440 1993-07-06 No Violations Noted DRILLED; E&S, PITS OK
1814875 2009-07-17 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag. However, T&F stated in conversation that tag was on the well. According to my conversation with T&F, well tag will be checked again. No visible E&S concerns at the time of inspection. No IW discharge issues. Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position. According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair. Production equipment consisted of separator, heater, and two 100 bbl brine tanks. No well head pressure gauge present. DEP requested a telephone call when the well is placed back into production.
1829179 2009-09-16 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag. T&F added well tag to well head. No visible E&S concerns at the time of inspection. No IW discharge issues. Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position. According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair. Production equipment consisted of separator, heater, and two 100 bbl brine tanks. No well head pressure gauge present. Well is still inactive mode during the inspection.


2012154 2011-10-20 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. Well tag was present. No visible E&S concerns at the time of inspection. No IW discharge issues. According to T&F, the well has been placed to production mode. Transmission line to the well was repaired. Production equipment consisted of separator, meter, heater, and three 100 bbl brine tanks (< 20 bbls fluid).
2040781 2012-01-31 No Violations Noted At the time of inspection, no E&S issues were present. Gas well was in production.
2143526 2013-02-05 Cambria Croyle Twp No Violations Noted
2237759 2014-01-16 No Violations Noted At the time of inspection, no E&S issues were present. Gas well was not in production

References