X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-27943

Well Details

Well ID: 37-129-27943
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID: 146615
Farm/Lease Name: CARR 19A
License Status: Active
Spud Date: 09/01/2009
Permit Date: 6/11/2009
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.379750
Longitude: -79.471778

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 ATLAS RESOURCES LLC 11,699.00 117 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 37.00 184 0.00 0 0.00 0
2012 ATLAS RESOURCES LLC 259.00 189 0.00 0 0.00 0
2013 ATLAS RESOURCES LLC 525.00 110 0.00 0 0.00 0
2014 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 ATLAS RESOURCES LLC 511.00 77 0.00 0 0.00 0
2016 ATLAS RESOURCES LLC 161.00 61 0.00 0 0.00 0
2017 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 ATLAS RESOURCES LLC 155.00 30 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Drilling 878.00 Bbl Municipal Sewage Treatment Plant
2009-A00 Fracking Fluid 1,160.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Fracking Fluid 1,200.00 Bbl Municipal Sewage Treatment Plant
2009-A00 Fracking Fluid 7,320.00 Bbl Reuse other than road spreading
2010-A01 Drilling Fluid Waste (in Barrels) 878.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Fracing Fluid Waste (in Barrels) 1,315.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Fracing Fluid Waste (in Barrels) 1,160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Fracing Fluid Waste (in Barrels) 12,130.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-A01 Produced Fluid (in Barrels) 537.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Produced Fluid (in Barrels) 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Produced Fluid (in Barrels) 4,226.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Drilling Fluid Waste (in Barrels) 439.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Fracing Fluid Waste (in Barrels) 657.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Fracing Fluid Waste (in Barrels) 580.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Fracing Fluid Waste (in Barrels) 6,065.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Produced Fluid (in Barrels) 268.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Produced Fluid (in Barrels) 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Produced Fluid (in Barrels) 2,113.00 Bbl IDENTIFY METHOD IN COMMENTS
2012-S01 Produced Fluid (in Barrels) 620.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 335.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-S01 Produced Fluid (in Barrels) 535.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 85.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1819344 Primary Facility 07/29/2009 Drilling/Alteration No Violations Noted MARCELLUS - drilling in process/E&S ok/ID&pit ok
1819431 Primary Facility 08/10/2009 Drilling/Alteration No Violations Noted MARCELLUS - tophole completed - rig moved off/E&S ok/ID and pit ok
1823372 Primary Facility 08/19/2009 Drilling/Alteration No Violations Noted MARCELLUS - current depth 2286ft - attempting to cement unexpected water @ 2247ft/E&S ok/ID&pit ok
1823375 Primary Facility 08/20/2009 Drilling/Alteration No Violations Noted MARCELLUS - well plugged due to downhole problems/E&S ok/ID&pit ok
1825836 Primary Facility 09/03/2009 Drilling/Alteration No Violations Noted skid rig - redrilling/E&S ok/ID&pit ok
1825838 Primary Facility 08/25/2009 Plugging(Includes Plugged/Mined Through) No Violations Noted drill pipe stuck in hole - plugging - rig to be skid/ID&pit ok/E&S ok
1827799 Primary Facility 09/10/2009 Drilling/Alteration No Violations Noted drilling - skid rig/ID&pit ok/E&S ok
1831004 Primary Facility 09/22/2009 Drilling/Alteration No Violations Noted MACELLUS - drilling commenced/E&S ok/ID&pit ok
1831005 Primary Facility 09/17/2009 Drilling/Alteration No Violations Noted MARCELLUS - drilling/E&S ok/ID&pit ok
1836303 Primary Facility 09/24/2009 Routine/Complete Inspection No Violations Noted At the time of the inspection, drilling was in process. Pit appears to be sound. E&S controls installed properly (filter socks, rip rap). There is no evidence of accelerated erosion or sedimentation on the access road or well site. The operator should continue to monitor the site for erosion and sedimentation.
1843921 Primary Facility 11/12/2009 Drilling/Alteration No Violations Noted MARCELLUS - drilling&frac complete/E&S ok/ID&pit ok
1873485 Primary Facility 03/25/2010 Site Restoration No Violations Noted Carr 19 was a rig skid. The original hole has been plugged and the monument was located.
1873487 Primary Facility 03/08/2010 Routine/Complete Inspection No Violations Noted The well has been drilled and is in production. Brine tanks appear to be in sound condition. The site has been re-graded and is rocked. E&S controls are in place. There is no evidence of erosion and sedimentation on the access road or well site. The site will be revisited in the spring to check for uniform vegetative growth.
1969835 Primary Facility 04/22/2011 Site Restoration No Violations Noted The well has been drilled and is in production. Tag located. Brine tanks appear to be in sound condition. E&S controls are in place. There is no evidence of erosion and sedimentation on the access road or well site. The vegetation is well established and the site is restored at this time.
2281849 Primary Facility 06/25/2014 Routine/Complete Inspection No Violations Noted Well operational and properly identified. Operator reported 1 day of production (2 Mcf) for 07/2013 through 12/2013.
2451259 Primary Facility 2016-02-17 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Three brine tanks located on site, within earthen dike and appears to be structurally sound. Ground snow covered and appears stable, with no observable E&S issues in relation to site and/or access road.
2706130 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within earthen dike and appears structurally sound. No E&S issues.
2843928 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment and tank battery look ok.

For data sources see[6]

References