If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-20091 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.329566,"lon":-77.167428,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Anthony Township | |
| Operator Name: EXCO RESOURCES PA LLC | |
| Well Pad ID: 146229 | |
| Farm/Lease Name: POOR SHOT UNIT 1H | |
| License Status: Active | |
| Spud Date: 04/25/2008 | |
| Permit Date: 3/14/2008 | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Latitude: 41.329566 | |
| Longitude: -77.167428 |
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | 0.00 | 0.00 | 0.00 | ||||
| 2009 | 0.00 | 0.00 | 0.00 | ||||
| 2010 | CHIEF OIL & GAS LLC | 17,194.00 | 8 | 0.00 | 0 | 0.00 | 0 |
| 2011 | CHIEF OIL & GAS LLC | 1,056,714.00 | 243 | 0.00 | 0 | 0.00 | 0 |
| 2012 | EXCO RESOURCES PA LLC | 1,241,679.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | EXCO RESOURCES PA LLC | 662,420.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | EXCO RESOURCES PA LLC | 486,236.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | EXCO RESOURCES PA LLC | 327,131.00 | 337 | 0.00 | 0 | 0.00 | 0 |
| 2016 | EXCO RESOURCES PA LLC | 306,204.00 | 275 | 0.00 | 0 | 0.00 | 0 |
| 2017 | EXCO RESOURCES PA LLC | 265,427.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2018 | EXCO RESOURCES PA LLC | 277,344.00 | 364 | 0.00 | 0 | 0.00 | 0 |
| 2019 | EXCO RESOURCES PA LLC | 51,238.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
| Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|
| 2008-A00 | Drilling | 493.00 Bbl | Municipal Sewage Treatment Plant | PA0020486 |
| 2008-A00 | Drilling | 2,714.00 Bbl | Municipal Sewage Treatment Plant | PA0025933 |
| 2008-A00 | Drilling | 624.00 Bbl | Municipal Sewage Treatment Plant | PA0028665 |
| 2008-A00 | Drilling | 624.00 Bbl | Municipal Sewage Treatment Plant | PA0037966 |
| 2009-A00 | Brine | 300.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0028665 |
| 2009-A00 | Brine | 754.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2009-A00 | Drilling | 623.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2009-A00 | Drilling | 1,123.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0102784 |
| 2010-A01 | Drilling Fluid Waste (in Barrels) | 4,024.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2010-A01 | Drilling Fluid Waste (in Barrels) | 624.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010-A01 | Produced Fluid (in Barrels) | 755.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010-S01 | Drilling Fluid Waste (in Barrels) | 2,012.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2010-S01 | Drilling Fluid Waste (in Barrels) | 312.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010-S01 | Produced Fluid (in Barrels) | 377.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2010-S02 | Drilling Fluid Waste (in Barrels) | 590.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
| 2010-S02 | Produced Fluid (in Barrels) | 1,767.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
| 2011-S01 | Fracing Fluid Waste (in Barrels) | 952.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2011-S01 | Fracing Fluid Waste (in Barrels) | 1,340.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2011-S01 | Produced Fluid (in Barrels) | 238.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
| 2011-S01 | Produced Fluid (in Barrels) | 357.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2011-S01 | Produced Fluid (in Barrels) | 1,038.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2011-S01 | Produced Fluid (in Barrels) | 119.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2011-S02 | Produced Fluid (in Barrels) | 502.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2012-S01 | Produced Fluid (in Barrels) | 657.15 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2012-S02 | Produced Fluid (in Barrels) | 219.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2012-S02 | Produced Fluid (in Barrels) | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013-S01 | Produced Fluid (in Barrels) | 109.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2013-S02 | Produced Fluid (in Barrels) | 109.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
| 2013-S02 | Produced Fluid (in Barrels) | 109.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
| 2014-S01 | Produced Fluid (in Barrels) | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
| 2014-S02 | Produced Fluid (in Barrels) | 110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2014-S02 | Produced Fluid (in Barrels) | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
| 2015-S01 | Produced Fluid (in Barrels) | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016-S01 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2016-S02 | Produced Fluid (in Barrels) RWC 802 | 50.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2017-M01 | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
| 2017-M07 | Produced Fluid (in Barrels) RWC 802 | 200.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2018-M02 | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2018-M06 | Produced Fluid (in Barrels) RWC 802 | 205.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2018-M07 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2018-M08 | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2018-M12 | Produced Fluid (in Barrels) RWC 802 | 50.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
| 2019-M03 | Produced Fluid (in Barrels) RWC 802 | 100.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[5]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1700977 | Primary Facility | 04/18/2008 | Routine/Complete Inspection | No Violations Noted | |
| 1701280 | Primary Facility | 04/22/2008 | Drilling/Alteration | No Violations Noted | |
| 1703421 | Primary Facility | 04/30/2008 | Drilling/Alteration | No Violations Noted | |
| 1704373 | Primary Facility | 05/06/2008 | Routine/Complete Inspection | No Violations Noted | |
| 1704659 | Primary Facility | 04/19/2008 | Drilling/Alteration | No Violations Noted | |
| 1705250 | Primary Facility | 05/07/2008 | Drilling/Alteration | No Violations Noted | |
| 1706310 | Primary Facility | 04/30/2008 | Drilling/Alteration | No Violations Noted | |
| 1709387 | Primary Facility | 05/22/2008 | Drilling/Alteration | No Violations Noted | |
| 1709668 | Primary Facility | 05/29/2008 | Drilling/Alteration | No Violations Noted | |
| 1711122 | Primary Facility | 06/03/2008 | Drilling/Alteration | No Violations Noted | |
| 1713207 | Primary Facility | 06/03/2008 | Routine/Complete Inspection | No Violations Noted | |
| 1715227 | Primary Facility | 06/16/2008 | Drilling/Alteration | No Violations Noted | |
| 1718502 | Primary Facility | 06/27/2008 | Drilling/Alteration | No Violations Noted | |
| 1719995 | Primary Facility | 07/10/2008 | Drilling/Alteration | No Violations Noted | |
| 1864600 | Primary Facility | 02/17/2010 | Routine/Complete Inspection | No Violations Noted | |
| 1900792 | Primary Facility | 07/21/2010 | Routine/Partial Inspection | No Violations Noted | |
| 1961280 | Primary Facility | 03/29/2011 | Routine/Partial Inspection | No Violations Noted | |
| 1965627 | Primary Facility | 04/12/2011 | Routine/Complete Inspection | No Violations Noted | |
| 2019203 | Primary Facility | 11/14/2011 | Routine/Complete Inspection | No Violations Noted | |
| 2043863 | Primary Facility | 02/17/2012 | Routine/Complete Inspection | No Violations Noted | |
| 2082847 | Primary Facility | 07/12/2012 | Routine/Complete Inspection | No Violations Noted | |
| 2484055 | Primary Facility | 2016-05-11 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 5/11/2016.
I entered the location at 15:17 and began the inspection. The Poor Shot Transfer pad off Stony Gap Road, the Poor Shot Unit 2H well pad, The Poor Shot Unit 3H well pad, and the Poor Shot 1H well pad were all constructed under one ESCGP (ESX10-081-0023). The Poor Shot Freshwater Impoundment was never constructed. A : At the Poor Shot transfer pad, the pad location remains at its originally constructed size. The Site Restoration Plan calls for Sediment Ditch #1, Sediment Trap #1, and Sediment Ditch #2 to be removed. In addition, erosion is noted on the north side of the pad near the western edge of Diversion Ditch #1. I recommend correcting this erosion as soon as possible. This part of the ESCGP has not been restored as per the ESCGP. B : At the Poor Shot Unit 2H well pad, the Poor Shot East Unit 1H (081-20092) and Poor Shot E Unit 2H (081-20278) wells were both in production. The Site Restoration Plan calls for one 60’ Infiltration Berm to be constructed. The Infiltr |
| 2512920 | Primary Facility | 2016-08-15 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well. Well tag becoming illegible. No violations noted. |
| 2814078 | Primary Facility | 2018-12-12 | Routine/Complete Inspection | No Violations Noted | One well staged for production phase. One GPU within containment. No leaks detected from production equipment. No violations noted. |
| 2841895 | Primary Facility | 2019-02-11 | Routine/Complete Inspection | No Violations Noted | On February 11, 2019 Department representative Jared Jacobini conducted a routine site inspection at EXCO Poor Shot Unit 1H OG Well. The site sign, drilling permits, weekly E&S reports, and emergency response plan were onsite for review. PSCM's have not been installed. No erosion issues were observed. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover. One well in production phase. One GPU within containment. No leaks detected from production equipment.
No violations noted. |
For data sources see[6]