X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24619

Well Details

Well ID: 37-051-24619
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 145441
Farm/Lease Name: SANFILIPPO UNIT 7H
License Status: Active
Spud Date: 01/15/2015
Permit Date: 1/15/2015
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.981539
Longitude: -79.8388

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHEVRON APPALACHIA LLC 106,792.00 24 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 706,537.00 318 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 676,292.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 474,002.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 99,995.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2015-S01 Drill Cuttings (in Tons) 69.60 Tons LANDFILL 100172
2015-S01 Drill Cuttings (in Tons) 752.08 Tons LANDFILL 100419
2015-S01 Fracing Fluid Waste (in Barrels) 43.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Fracing Fluid Waste (in Barrels) 6,299.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Fracing Fluid Waste (in Barrels) 7,245.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Fracturing Fluid Waste (in Tons) 6.97 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015-S02 Produced Fluid (in Barrels) 40.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Filter Socks (in Tons) RWC 812 0.23 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 369.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 920.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 48.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S01 Produced Fluid (in Barrels) RWC 802 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-S01 Produced Fluid (in Barrels) RWC 802 7,426.20 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Synthetic Liner Materials (in Tons) RWC 806 1.89 Tons LANDFILL 100663
2016-S02 Produced Fluid (in Barrels) RWC 802 2,488.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 420.22 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Waste Water Treatment Sludge (in Tons) RWC 804 0.38 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-M01 Produced Fluid (in Barrels) RWC 802 502.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M01 Produced Fluid (in Barrels) RWC 802 4.69 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017-M02 Produced Fluid (in Barrels) RWC 802 362.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 111.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 158.00 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 112.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M04 Produced Fluid (in Barrels) RWC 802 23.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 10,500.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M06 Drilling Fluid Waste (in Barrels) RWC 803 89.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 71.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 23.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 93.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M07 Produced Fluid (in Barrels) RWC 802 87.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M07 Produced Fluid (in Barrels) RWC 802 46.00 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 71.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M08 Produced Fluid (in Barrels) RWC 802 47.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M08 Produced Fluid (in Barrels) RWC 802 45.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M08 Produced Fluid (in Barrels) RWC 802 68.00 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 22.40 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M11 Produced Fluid (in Barrels) RWC 802 23.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017-M11 Produced Fluid (in Barrels) RWC 802 70.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Produced Fluid (in Barrels) RWC 802 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M11 Produced Fluid (in Barrels) RWC 802 137.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M12 Produced Fluid (in Barrels) RWC 802 14.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017-M12 Produced Fluid (in Barrels) RWC 802 193.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M01 Produced Fluid (in Barrels) RWC 802 41.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M01 Produced Fluid (in Barrels) RWC 802 202.80 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Produced Fluid (in Barrels) RWC 802 44.40 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 59.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M03 Produced Fluid (in Barrels) RWC 802 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Produced Fluid (in Barrels) RWC 802 20.00 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 22.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M04 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M05 Produced Fluid (in Barrels) RWC 802 44.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M05 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M06 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 23.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M07 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M08 Produced Fluid (in Barrels) RWC 802 152.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M09 Produced Fluid (in Barrels) RWC 802 174.40 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Produced Fluid (in Barrels) RWC 802 22.80 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 123.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M12 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 111.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Produced Fluid (in Barrels) RWC 802 21.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M01 Produced Fluid (in Barrels) RWC 802 114.00 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M02 Produced Fluid (in Barrels) RWC 802 70.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2337389 Primary Facility 01/16/2015 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection and had begun on 01/15/15. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2338884 Primary Facility 01/15/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Auger rig setting conductor @ 55' and cementing today.
2338981 Primary Facility 01/22/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Highlands drilling on air @ 332' today. Prepairing to set cementing tonight (1/21/2015).
2345166 Primary Facility 01/23/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Highlands drilling on air @ 432' today and cementing tonght ( 1/23/2015).
2345236 Primary Facility 01/26/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Highlands drilling on air @ 751' (TD) today . Cementing tonight ( 1/25/2015).
2356068 Primary Facility 03/04/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Rig moving on to Sanfilippo # 7 - H today.
2356075 Primary Facility 03/12/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Rig drilling on fluid @ 12,646' (TD).Running 51/2" Prod. Casing and cementing today (3/11/2015).
2435754 Primary Facility 12/23/2015 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Stimulation completed , in process of removing flow back equipment and cleaning up site.
2453374 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted On 12/24/15 the Department received a request for site restoration extension from Chevron Appalachia LLC for the Sanfilippo Pad A and Pad B.

On 01/04/16 at approximately 0700 hours I conducted a routine complete inspection of the site. The Act 9 sign was in place. All required documents were present at the site.

The site was not restored at the time of inspection. It appeared the pipeline connection had been recently installed to the Pad A. The site was stable.

The Department has reviewed the request for site restoration extension. The restoration date was to be 03/24/16, but a new date of 10/31/16 has been approved for both the Pad A and Pad B.

2494944 Primary Facility 2016-06-08 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Completing final restoration.
2564236 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was vegetated, but additional growth is needed to reach a uniform 70% growth. Small erosion rills were observed on the site (see photographs). The rills had been addressed by Chevron and straw bale BMPs were in place to prevent further erosion. One rill appeared to have previously had straw bale BMPs present, but they had since degraded. It is recommended this location be addressed.
2693647 Primary Facility 2018-02-05 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal by Chevron. The Act 9 sign was in place and all required documents were present at the site. The production equipment on both Pad A and pad B appeared to be in good condition. The site was well vegetated and there were no signs of erosion observed. The site meets and exceeds 70% uniform vegetative cover. The NOT is approved.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/31/2015 09/11/2015 8412 5,770,420.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 9.6913 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 90.1286 0
7.5% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 8 0.00934897 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00042138 0
M300 BASF Corporation Biocide Glutaral 111-30-8 25 0.0005613 0
Water 7732-18-5 75 0.00168391 0
A264 Schlumberger Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 10 0.00001306 0
Aliphatic alcohols, ethoxylated #1 Proprietary 30 0.00003919 0
Methanol 67-56-1 40 0.00005225 0
Aliphatic acids Proprietary 30 0.00003919 0
B317 Schlumberger Scale Inhibitor Trisodium ortho phosphate 7601-54-9 5 0.00010619 0
Ethane-1,2-diol 107-21-1 5 0.00010619 0
J580 Schlumberger Gelling Agent Carbohydrate Polymer Proprietary 100 0.0346298 0
J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00165742 0
U042 Schlumberger Iron Chelating Agent Trisodium nitrilotriacetate (im purity) 5064-31-3 10 0.00027925 0
Sodium hydroxide 1310-73-2 5 0.00013963 0
Tetrasodium ethylenediam inetetraacetate 64-02-8 60 0.00167551 0
J609W Schlumberger Friction Reducer Urea 57-13-6 5 0.00096276 0
Ammonium Sulfate 7783-20-2 30 0.00577659 0

For data sources see[7]

References