If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22174 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.737992,"lon":-75.987494,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 153516 | |
Farm/Lease Name: HOWELL G 6 | |
License Status: Active | |
Spud Date: 10/09/2016 | |
Permit Date: 3/7/2016 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.737992 | |
Longitude: -75.987494 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,255,446.27 | 48 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 5,820,368.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 874,746.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2016-2 | Drill Cuttings (in Tons) RWC 810 | 1,314.49 Tons | LANDFILL | 101247 |
2016-2 | Synthetic Liner Materials (in Tons) RWC 806 | 1.75 Tons | LANDFILL | 101247 |
2017-01 | Produced Fluid (in Barrels) RWC 802 | 532.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-01 | Synthetic Liner Materials (in Tons) RWC 806 | 8.13 Tons | LANDFILL | 101247 |
2017-02 | Synthetic Liner Materials (in Tons) RWC 806 | 20.75 Tons | LANDFILL | 101247 |
2017-03 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017-03 | Synthetic Liner Materials (in Tons) RWC 806 | 0.25 Tons | LANDFILL | 101247 |
2017-03 | Unused Fracturing Fluid Waste (in Tons) RWC 805 | 15.72 Tons | LANDFILL | 101247 |
2017-04 | Other Oil & Gas Wastes (in Tons) RWC 899 | 0.05 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017-04 | Produced Fluid (in Barrels) RWC 802 | 342.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-04 | Produced Fluid (in Barrels) RWC 802 | 1,237.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-04 | Synthetic Liner Materials (in Tons) RWC 806 | 0.23 Tons | LANDFILL | 101247 |
2017-04 | Waste Water Treatment Sludge (in Tons) RWC 804 | 19.98 Tons | REUSE (AT WELL PAD) | |
2017-05 | Servicing Fluid (in Barrels) RWC 808 | 65.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-05 | Servicing Fluid (in Barrels) RWC 808 | 616.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-05 | Waste Water Treatment Sludge (in Tons) RWC 804 | 39.06 Tons | REUSE (AT WELL PAD) | |
2017-06 | Servicing Fluid (in Barrels) RWC 808 | 328.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017-06 | Synthetic Liner Materials (in Tons) RWC 806 | 4.14 Tons | LANDFILL | 101247 |
2017-07 | Servicing Fluid (in Tons) RWC 808 | 6.29 Tons | LANDFILL | 100933 |
2017-07 | Synthetic Liner Materials (in Tons) RWC 806 | 10.20 Tons | LANDFILL | 101247 |
2017-08 | Synthetic Liner Materials (in Tons) RWC 806 | 3.54 Tons | LANDFILL | 101247 |
2017-08 | Waste Water Treatment Sludge (in Tons) RWC 804 | 2.94 Tons | REUSE (AT WELL PAD) | |
2017-10 | Servicing Fluid (in Barrels) RWC 808 | 427.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-10 | Synthetic Liner Materials (in Tons) RWC 806 | 4.26 Tons | LANDFILL | 101247 |
2017-11 | Produced Fluid (in Barrels) RWC 802 | 3,917.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-11 | Servicing Fluid (in Barrels) RWC 808 | 526.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-11 | Servicing Fluid (in Tons) RWC 808 | 40.01 Tons | LANDFILL | 100933 |
2017-11 | Synthetic Liner Materials (in Tons) RWC 806 | 1.10 Tons | LANDFILL | 101247 |
2017-11 | Waste Water Treatment Sludge (in Tons) RWC 804 | 2.70 Tons | REUSE (AT WELL PAD) | |
2017-12 | Produced Fluid (in Barrels) RWC 802 | 1,565.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-12 | Synthetic Liner Materials (in Tons) RWC 806 | 3.00 Tons | LANDFILL | 101247 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 739.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 154.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 227.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 311.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 384.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 101.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 322.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 44.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 153.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 148.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 142.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 74.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 128.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 111.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 37.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 150.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-09 | Produced Fluid (in Barrels) RWC 802 | 176.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 201.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 182.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-12 | Produced Fluid (in Barrels) RWC 802 | 132.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 155.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 124.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 170.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2493916 | Primary Facility | 2016-06-17 | Preoperation Inspection | No Violations Noted | |
2530700 | Primary Facility | 2016-10-11 | Drilling/Alteration | No Violations Noted | |
2539083 | Primary Facility | 2016-11-23 | Drilling/Alteration | No Violations Noted | |
2548970 | Primary Facility | 2016-12-20 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 13:00. Precision Drilling Rig #548 is at the site currently in the process of drilling the G Howell 2H well at depth of (2,147.17) feet. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department on 11/20/16. The notice indicates that Cabot would resume drilling of the G Howell 2H well on 11/21/16 at 12:00 PM. I met with Joel Franks, site company man of Cabot Oil and Gas. Mr. Franks stated the following. "The intermediate casing for the 2H well has been set at 2,045 feet. The surface casing for the 2H well was set at 950 feet. "The 2H well will be drilled to a total depth of 12,800 feet. The 2H well is being drilled with water based mud. The water mixed with the mud is fresh water from a nearby trout hatchery. The Derrick centrifuges are used to separate the drilling mud from the drill cuttings. The mud returns to the mud pits. The drill cuttings are dried with sawdust and sent to Keystone Landfill for disposal. New Park Rig Mats, Felt on t |
2568531 | Primary Facility | 2017-03-04 | Routine/Complete Inspection | No Violations Noted | Inspection of Cabot’s Howell G pad in Auburn Twp. Susquehanna County conducted Friday March 4th 2017 at 1:00 pm. Keane was rigged up on the pad to frack 4 wells; the 8H, 6H, 4H, 2H. The crew was tied into the 8H at the time of inspection, the first well of four on the pad, about to come on line for the first stage. I met with the Companyman. He said they began to rig up on Tuesday. At that time, they shut in the (9 5/8” x 5 ½”) annulus for digital monitoring during operations. I went in the frack van to take a look at rate and pressures as they come on-line to pump this first stage. Pressures observed before coming online are as follows; (8H) (current well); 235 PSI casing, -4.93 annulus (6H) 0 PSI casing, -22.88 PSI annulus (4H) 19.29 PSI casing, 19.29 PSI annulus and (2H) 28.34 PSI casing, 3.36 PSI annulus. The crew pressure tested @12K, no issues, open wellhead pressure 632 PSI, came online for first stage and took it up to ~4500PSI, no significant increase in pressure on the annulus just a few PSI attrib |
2572528 | Primary Facility | 2017-03-13 | Incident- Response to Accident or Event | Pending | The incident was reported and the Department has requested a copy of a spill report when when available. If you have any questions, please contact me. |
2575674 | Primary Facility | 2017-03-27 | Administrative/File Review | Pending | The operator had provided a copy of the spill report. I will conduct a Follow-Up Inspection at my earliest convenience. - Invalid Complaint Id. - 32550 |
2575914 | Primary Facility | 2017-03-16 | Follow-up Inspection | Violation(s) Noted | |
2586262 | Primary Facility | 2017-04-11 | Follow-up Inspection | Pending | |
2592163 | Primary Facility | 2017-04-21 | Follow-up Inspection | Pending | |
2601838 | Primary Facility | 2017-05-22 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:45. The weather conditions were cloudy skies with light to moderate rain falling with temperatures in the lower 60's. I met with Jim Restly, site company man, consultant of Cabot. Mr. Restly stated the following. "Deep Well Services Rig #4 is in the process of squeezing cement on the 6H well. Hydraulic fracturing and frac plug drill outs have been completed on the 2H, 4H, 6H and 8H wells. This particular rig has been here for about a month squeezing the cement, drilling out the cement and running segmented bond logs on the 4H and 6H wells. Currently, only freshwater is being used to squeeze and drill out cement. There are (2) cast iron bridge plugs set in place in the 4H and 6H wells at around (5,800)and (5,900) feet, to hold gas in place while drilling out cement. It has not yet been determined as to when this project will be completed. Once this project is completed, then flowback of the (4) wells should commence." Prior to departing the site, Resource Environmental informed m |
2622934 | Primary Facility | 2017-08-07 | Administrative/File Review | No Violations Noted | Restoration Extension Request received on 03AUG2017. |
2656804 | Primary Facility | 2017-06-20 | Administrative/File Review | Violation(s) Noted | Administrative Inspection created for the purpose of entering an Enforcement Record for the June 20, 2017 Notice of Violation regarding gas outside the surface casing on the Howell G 6 gas well and three water supply complaints involving elevated dissolved methane and/or combustible gas in the headspace of the three water supply wells. The Department sent Cabot a notice of legal presumption letter on March 7, 2017 for the first water supply and sent a second notice of legal presumption letter on June 14, 2017 for the second and third water supplies.
All violations cited in the Department's March 16, 2017 inspection along with the CSL 401 violation cited in this inspection are against the Howell G 6 gas well. |
2725246 | Primary Facility | 2018-05-01 | Routine/Complete Inspection | No Violations Noted | I inspected the Howell on May 1, 2018 for a routine complete inspection. The wells associated with this site are as follows: 115-22172, 115-22173, 115-22174, 115-22175. The wells were properly labeled.
The fill slope was stable but repaired with riprap in various locations. It was well vegetated elsewhere. The cut slope was well vegetated. The pad surface and access road were stable and the entrance showed evidence of recent minor repair. There were no erosional issues apparent. There were no violations |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2575914 | 781791 | 2017-03-16 | 78a73(b) | Environmental Health & Safety | Gas detected OS Surface casing. (20x13) | |
2575914 | 781792 | 2017-03-16 | 78a81(a)2 | Environmental Health & Safety | Gas detected OS Surface casing. (20x13) Water Complaint in area. | |
2575914 | 781793 | 2017-03-16 | 78a81(a)3 | Environmental Health & Safety | Gas detected OS Surface casing. (20x13) Water Complaint in area. | |
2575914 | 781794 | 2017-03-16 | 78a85(a)5 | Environmental Health & Safety | Gas detected OS Surface casing. (20x13) Water Complaint in area. | |
2656804 | 801109 | 2017-06-20 | CSL 401 | Environmental Health & Safety | The Department's investigation revealed that Cabot has caused or allowed the unpermitted discharge of combustible gas from lower formations to waters of the Commonwealth, specifically three private water supplies in Auburn Township, Susquehanna County. Because previous violations for gas outside of |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
781791 | 359215 | NOV - Notice of Violation | |||||
781792 | 359215 | NOV - Notice of Violation | |||||
781793 | 359215 | NOV - Notice of Violation | |||||
781794 | 359215 | NOV - Notice of Violation | |||||
801109 | 359215 | NOV - Notice of Violation |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/05/2017 | 03/25/2017 | 6884 | 17,316,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer, KFR-20 | Keane | Friction Reducer | ammonium chloride | 12125-02-9 | 30 | 0.0250092 | 40767.6 |
Petroleum distillate | 64742-47-8 | 1 | 0.000833641 | 1358.92 | ||||
oleic acid diethanolamide | 93-83-4 | 1 | 0.000833641 | 1358.92 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 5 | 0.00416821 | 6794.6 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 5 | 0.00416821 | 6794.6 | ||||
Water | 7732-18-5 | 30 | 0.0250092 | 40767.6 | ||||
Acid Inhibitor, KAI-13 | Keane | Acid Inhibitor | isoproyl alcohol | 67-63-0 | 5 | 0.00004470 | 72.869 | |
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000178807 | 291.474 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.00008940 | 145.737 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00008940 | 145.737 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.000357615 | 582.948 | ||||
formic acid | 64-18-6 | 10 | 0.00008940 | 145.737 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00008940 | 145.737 | ||||
Iron Control, KFEAC-20/30 | Keane | Iron Control | Acetic acid | 64-19-7 | 5 | 0.000125771 | 205.02 | |
Citric acid | 77-92-9 | 30 | 0.000754628 | 1230.12 | ||||
Water | Cabot | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.6482 | 144,506,000.0 | |
Scale Inhibitor, KLSI-20 | Keane | Scale Inhibitor | Water | 7732-18-5 | 70 | 0.0133638 | 21784.4 | |
Sodium Chloride | 7647-14-5 | 3 | 0.000572735 | 933.615 | ||||
organic phosphonic acids salts | 15827-60-8 | 17 | 0.0032455 | 5290.49 | ||||
Methyl Alcohol | 67-56-1 | 10 | 0.00190911 | 3112.05 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 11.2065 | 18,267,700.0 | |
Hydrochloric Acid (15%) | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00453855 | 7398.3 | |
Water | 7732-18-5 | 7.5 | 0.00226928 | 3699.15 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ethoxylated alcohol | 68131-39-5 | 10 | 0.00008940 | 145.737 | |
Petroleum distillate | 64742-47-8 | 1 | 0.000833641 | 1358.92 | ||||
Methyl Alcohol | 67-56-1 | 10 | 0.00190911 | 3112.05 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 5 | 0.00416821 | 6794.6 | ||||
Water | 7732-18-5 | 7.5 | 0.00226928 | 3699.15 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00008940 | 145.737 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00008940 | 145.737 | ||||
Glutaral | 111-30-8 | 26.7 | 0.00244702 | 3988.88 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000178807 | 291.474 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 5 | 0.00416821 | 6794.6 | ||||
Citric acid | 77-92-9 | 30 | 0.000754628 | 1230.12 | ||||
ammonium chloride | 12125-02-9 | 30 | 0.0250092 | 40767.6 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000730439 | 1190.69 | ||||
organic phosphonic acids salts | 15827-60-8 | 17 | 0.0032455 | 5290.49 | ||||
oleic acid diethanolamide | 93-83-4 | 1 | 0.000833641 | 1358.92 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides | 68424-85-1 | 5.3 | 0.000486654 | 793.295 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00004470 | 72.869 | ||||
formic acid | 64-18-6 | 10 | 0.00008940 | 145.737 | ||||
Sodium Chloride | 7647-14-5 | 3 | 0.000572735 | 933.615 | ||||
Biocide, MBC-516 | Keane | Biocide | Glutaral | 111-30-8 | 26.7 | 0.00244702 | 3988.88 | |
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000730439 | 1190.69 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides | 68424-85-1 | 5.3 | 0.000486654 | 793.295 | ||||
Water | 7732-18-5 | 56.7 | 0.0051983 | 8473.76 |
For data sources see[7]