X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20414

Well Details

Well ID: 37-007-20414
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 150486
Farm/Lease Name: B3 PER B3-4H
License Status: Active
Spud Date: 04/11/2014
Permit Date: 11/12/2013
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.760117
Longitude: -80.167081

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 334,463.00 96 0.00 0 5,225.00 96
2016 PENNENERGY RESOURCES LLC 939,308.00 366 0.00 0 10,052.00 366
2017 PENNENERGY RESOURCES LLC 687,086.00 341 0.00 0 5,752.00 341
2018 PENNENERGY RESOURCES LLC 575,779.00 348 0.00 0 3,847.00 348
2019 PENNENERGY RESOURCES LLC 125,577.00 78 0.00 0 929.00 78

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2014-2 Drill Cuttings (in Tons) 830.09 Tons LANDFILL CID # 28726
2014-2 Drilling Fluid Waste (in Barrels) 1,780.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015-1 Fracturing Fluid Waste (in Tons) 67.20 Tons LANDFILL CID # 28726
2016-1 Produced Fluid (in Barrels) RWC 802 9,140.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 238.43 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2016-2 Produced Fluid (in Barrels) RWC 802 976.86 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016-2 Produced Fluid (in Barrels) RWC 802 960.74 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016-2 Produced Fluid (in Barrels) RWC 802 435.95 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016-2 Produced Fluid (in Barrels) RWC 802 3,361.50 Bbl REUSE OTHER THAN ROAD SPREADING
2017-01 Produced Fluid (in Barrels) RWC 802 535.43 Bbl REUSE (AT WELL PAD)
2017-02 Produced Fluid (in Barrels) RWC 802 398.17 Bbl REUSE (AT WELL PAD)
2017-03 Produced Fluid (in Barrels) RWC 802 54.00 Bbl REUSE (AT WELL PAD)
2017-04 Produced Fluid (in Barrels) RWC 802 14.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017-04 Produced Fluid (in Barrels) RWC 802 423.00 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 395.00 Bbl REUSE (AT WELL PAD)
2017-06 Produced Fluid (in Barrels) RWC 802 52.70 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 118.77 Bbl REUSE (AT WELL PAD)
2017-08 Produced Fluid (in Barrels) RWC 802 274.00 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 253.41 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 58.92 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 27.00 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 135.40 Bbl REUSE (AT WELL PAD)
2018-01 Produced Fluid (in Barrels) RWC 802 262.08 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 27.97 Bbl REUSE (AT WELL PAD)
2018-03 Produced Fluid (in Barrels) RWC 802 303.96 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 245.09 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 162.64 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 184.88 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 247.32 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 164.40 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 28.01 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 28.31 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 27.26 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 28.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018-12 Produced Fluid (in Barrels) RWC 802 53.32 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 184.80 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 27.83 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 270.17 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2260627 Primary Facility 04/08/2014 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2267301 Primary Facility 04/21/2014 Routine/Complete Inspection No Violations Noted The conductor was set for this well targeting the either the Genesee or the Marcellus layer. The inspection for this well was conducted concurrently with the inspection for site number 776908 (inspection report # 2267205). The water impoundment was under construction at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were noted.
2274954 Primary Facility 04/16/2014 Drilling/Alteration No Violations Noted THE CONDUCTOR IS IN. A SOUND WALL IS BEING BUILT. WORK BEING DONE ON THE PAD.
2275032 Primary Facility 04/23/2014 Drilling/Alteration No Violations Noted ROCKY MOUNTAIN DRILLING INSTALLED 40' OF 20" CONDUCTOR PIPE. THE SITE IS OK.
2276869 Primary Facility 05/23/2014 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. RIG HAS MOVED FROM THE SITE.
2276918 Primary Facility 06/03/2014 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. ALL EQUIPTMENT REMOVED. PAD IS STILL DOWN.
2288988 Primary Facility 06/12/2014 Routine/Complete Inspection No Violations Noted The inspection for this well was conducted concurrently with the inspection for site number 776908. The conductor was set but the tophole was not yet drilled. The water impoundment was constructed but not lined at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. A moderate slip was noted on the topsoil pile but adequate vegetative growth and E&S controls appeared to prevent off-site transport of sediment.
2296841 Primary Facility 08/07/2014 Drilling/Alteration No Violations Noted HIGHLAND RIG 7 IS SET UP ON THE 4H WELL. THE CONDUCTOR IS IN AND DRILLING WILL START LATER IN THE DAY.
2297589 Primary Facility 08/22/2014 Routine/Complete Inspection No Violations Noted The inspection for this well was conducted concurrently with the inspection for site number 776908. Well was properly labeled. Topsoil pile had adequate vegetative growth. E&S controls were sufficient to prevent off-site transport of sediment. Damp area was noted at corner of containment. Department requests operator ensure containment is adequate to contain residual waste.
2297611 Primary Facility 08/18/2014 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE. THE PAD REMAINS COVERD FOR PATTERSON RIG 259. THE SITE IS IN GOOD CONDITION.
2307370 Primary Facility 09/25/2014 Drilling/Alteration No Violations Noted RIG STARTED BOTTOM HOLE AT 2,335'. THEY HAVE ADVANCED THE HOLE TO5,087'.
2350397 Primary Facility 01/20/2015 Complaint Inspection No Violations Noted
2361485 Primary Facility 04/10/2015 Routine/Complete Inspection No Violations Noted
2365878 Primary Facility 04/28/2015 Routine/Complete Inspection No Violations Noted
2374346 Primary Facility 05/26/2015 Routine/Complete Inspection No Violations Noted
2381770 Primary Facility 06/19/2015 Routine/Complete Inspection No Violations Noted
2383246 Primary Facility 06/29/2015 Drilling/Alteration No Violations Noted THIS WELL IS FRACED AND SHUT IN.
2436868 Primary Facility 12/29/2015 Routine/Complete Inspection No Violations Noted
2448633 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted THIS WELL IS DRILLED FRACED AND PRODUCING.

THE SITE AND EQUIPTMENT ARE IN GOOD CONDITION.

2481820 Primary Facility 2016-04-26 Routine/Complete Inspection No Violations Noted THIS WELL HAS BEEN COMPLETED AND IS NOW PRODUCING.

THE SITE IS IN GOOD CONDITION.

2561318 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign installed and maintained. Freshwater impoundment installed and fenced in. Four wells in production. Two four hundred bbl tanks installed and maintained within secondary steel containment structure. Erosion and Sedimentation Best Management practices installed and maintained. Site stabilized in previously disturbed areas around pad and access road with vegetative growth. No apparent E/S issues.
2665299 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluid tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Freshwater impoundment located onsite and it contained what appeared to be freshwater.
2686194 Primary Facility 2018-01-12 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. All erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Two brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained fluids.
2856229 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/18/2015 05/22/2015 5288 10,456,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00325474 3329.45
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.7477 12,017,400.0
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0210516 21534.9
Unihib G GeoSafe Acid Corrosion Inhibitor Ethoxylated Alcohol 68002-97-1 35 0.000231015 236.318
Thiourea 62-56-6 1 0.00000660 6.752
Acetophenone 98-86-2 1 0.00000660 6.752
Methanol 67-56-1 5 0.00003300 33.76
Formaldehyde 50-00-0 1 0.00000660 6.752
Glycol Ether 112-34-5 60 0.000396026 405.116
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.0114535 11716.4
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00572673 5858.19
Dibromoacetonitrile 3252-43-5 5 0.000954456 976.365
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00315998 3232.52
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.803129 821565
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.12 88,096,800.0
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001473 15.068
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.00141746 1450

For data sources see[7]

References