If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28281 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.171433,"lon":-79.591511,"icon":""}]} |
County: Westmoreland | |
Municipality: East Huntingdon Township | |
Operator Name: KRIEBEL MINERALS INC | |
Well Pad ID: | |
Farm/Lease Name: EHVFD ROCKTOWN UNIT 002 | |
First Permit Date: 2010-02-23 | |
Last Permit Date: 2011-01-27 | |
Spud Date: | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: ORND | |
Violations: 0 | |
Latitude: 40.171433 | |
Longitude: -79.591511 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1861630 | 2010-02-08 | No Violations Noted | On February 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. Also on site was DEP WQS Nick Staffieri. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Buffalo Creek. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table. |
For data sources see[2]