If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615120711002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.254104,"lon":-115.777896,"icon":""}]} |
Location: 00/11-07-061-12W5/2 | |
Location Alias: 00/11-07-61-12 W5M | |
Location Alias 2: 00/11-07-061-12 W5/02 | |
Province: Alberta | |
County/Municipality: Woodlands County | |
Well Name: ACCEL HOLDINGS CARSON 16-6-61-12 | |
Operator Name: Accel Canada Holdings Limited | |
License Number: 0418772 | |
License Date: 2010-02-22 | |
License Status: Suspension | |
Spud Date: 2010-05-12 | |
Final Drill Date: 2010-09-10 | |
Well Total Depth: 4019 m | |
Surface Hole Latitude: 54.254104 | |
Surface Hole Longitude: -115.777896 |
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-15 | 2272 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-02 | Open Hole/Barefoot Completion | 4014 | 4019 | 0 |
2010-10-03 | Multi-Stage Fracture | 2277.3 | 2277.4 | 0 |
2010-10-03 | Multi-Stage Fracture | 2780.6 | 2780.7 | 0 |
2010-10-03 | Multi-Stage Fracture | 2861.3 | 2861.4 | 0 |
2010-10-03 | Multi-Stage Fracture | 2942.7 | 2942.8 | 0 |
2010-10-03 | Multi-Stage Fracture | 3035.6 | 3035.7 | 0 |
2010-10-03 | Multi-Stage Fracture | 3116.7 | 3116.8 | 0 |
2010-10-03 | Multi-Stage Fracture | 3198.4 | 3198.5 | 0 |
2010-10-03 | Multi-Stage Fracture | 3294.2 | 3294.3 | 0 |
2010-10-03 | Multi-Stage Fracture | 3352.8 | 3352.9 | 0 |
2010-10-03 | Multi-Stage Fracture | 3437.9 | 3438 | 0 |
2010-10-03 | Multi-Stage Fracture | 3534.3 | 3534.4 | 0 |
2010-10-03 | Multi-Stage Fracture | 3642.8 | 3642.9 | 0 |
2010-10-03 | Multi-Stage Fracture | 3739.3 | 3739.4 | 0 |
2010-10-03 | Multi-Stage Fracture | 3822.4 | 3822.5 | 0 |
2010-10-03 | Multi-Stage Fracture | 3907.6 | 3907.7 | 0 |
2010-10-03 | Multi-Stage Fracture | 3979.4 | 3979.5 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1988 | 3033.3 | 0.0 | 1602.5 |
2011 | 7889 | 3523.4 | 0.0 | 1728.4 |
2012 | 5800 | 1991.2 | 0.0 | 1240.0 |
For data sources see[5]