X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836082807004

Well Details

Well ID: 0836082807004
Loading map...
Location: 00/07-28-083-08W6/4
Location Alias: 00/07-28-83-08 W6M
Location Alias 2: 00/07-28-083-08 W6/04
Province: Alberta
County/Municipality: Saddle Hills County
Well Name: TOURMALINE EARRING 7-28-83-8
Operator Name:
License Number: 0280349
License Date: 2003-01-10
License Status: Abandoned
Spud Date: 2003-01-15
Final Drill Date: 2003-01-28
Well Total Depth: 1902 m
Surface Hole Latitude: 56.222163
Surface Hole Longitude: -119.199643

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-17 Perforation 1700.5 1702.5 17
2003-02-18 Perforation 1700.5 1702.5 17
2003-02-19 Packing Device Capped w/Cement 1682 1690 0
2003-02-19 Perforation 1587 1591 17
2003-02-19 Perforation 1592.5 1595 17
2004-10-31 Perforation 1537.5 1539 17
2004-10-31 Perforation 1542 1543.5 17
2004-12-12 Packing Device Capped w/Cement 1522 1530 0
2004-12-14 Perforation 1441.5 1444 17
2005-08-05 Packing Device Capped w/Cement 1427 1435 0
2005-08-05 Perforation 1202.5 1206.5 17
2005-08-12 Fracture 1202.5 1206.5 0
2006-08-13 Perforation 1165 1167.5 17
2012-07-08 Packing Device Capped w/Cement 1182 1190 0
2012-07-08 Packing Device Capped w/Cement 1142 1150 0
2012-07-12 Perforation 1081 1082 17
2012-07-12 Cement Squeeze 1081 1082 0
2012-08-02 Perforation 986 986.9 17
2012-08-02 Packing Device Capped w/Cement 1069 1077 0
2012-08-03 Cement Squeeze 986 986.9 0
2012-08-04 Perforation 667 667.9 17
2012-08-04 Packing Device Capped w/Cement 975 983 0
2012-08-05 Cement Squeeze 667 667.9 0
2013-02-24 Packing Device Capped w/Cement 972.2 980.2 0
2013-02-25 Perforation 949 951 17
2013-02-26 Cement Squeeze 949 951 0
2013-02-27 Packing Device Capped w/Cement 937 945 0
2013-02-28 Perforation 614 616 17
2013-02-28 Cement Squeeze 614 616 0
2013-03-01 Packing Device Capped w/Cement 602 610 0
2013-03-05 Perforation 417 419 17
2013-03-06 Cement Squeeze 417 419 0
2013-03-06 Packing Device Capped w/Cement 404.4 412.4 0
2013-03-07 Perforation 344 347 17
2013-03-07 Cement Squeeze 344 347 0
2013-03-08 Packing Device Capped w/Cement 332 340 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 861 224.6 0.0 675.8
2006 3290 1748.3 0.0 2884.4
2007 2414 1063.6 0.0 1724.4

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-14 No Incident N/A N/A
2012-07-14 No Incident N/A N/A
2012-08-07 No Incident N/A N/A
2012-08-07 No Incident N/A N/A
2012-08-07 No Incident N/A N/A
2013-03-11 No Incident N/A N/A

For data sources see[5]

References