X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786110216030

Well Details

Well ID: 0786110216030
Loading map...
Location: 03/16-02-078-11W6/0
Location Alias: 03/16-02-78-11 W6M
Location Alias 2: 03/16-02-078-11 W6/00
Province: Alberta
County/Municipality: Saddle Hills County
Well Name: BIR 03-15 HZ 103 PCOUPES 16-2-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0481079
License Date: 2016-11-01
License Status: Amended
Spud Date: 2017-02-08
Final Drill Date: 2017-02-22
Well Total Depth: 5357 m
Surface Hole Latitude: 55.753008
Surface Hole Longitude: -119.619365

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
08 Feb 2017 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-02-11 1256
2017-02-15 2310 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-06 Open Hole/Barefoot Completion 5349 5357 0
2017-04-06 Multi-Stage Fracture 5325.9 5327.2 0
2017-04-07 Multi-Stage Fracture 5283.8 5284.7 0
2017-04-07 Multi-Stage Fracture 5224.2 5225.1 0
2017-04-07 Multi-Stage Fracture 5164.9 5165.8 0
2017-04-07 Multi-Stage Fracture 5105.3 5106.2 0
2017-04-07 Multi-Stage Fracture 5046.1 5047 0
2017-04-07 Multi-Stage Fracture 4986.5 4987.4 0
2017-04-07 Multi-Stage Fracture 4927.4 4928.3 0
2017-04-07 Multi-Stage Fracture 4867.8 4868.7 0
2017-04-07 Multi-Stage Fracture 4808.1 4809 0
2017-04-07 Multi-Stage Fracture 4749 4749.9 0
2017-04-07 Multi-Stage Fracture 4689.8 4690.7 0
2017-04-07 Multi-Stage Fracture 4630.2 4631.1 0
2017-04-07 Multi-Stage Fracture 4570.6 4571.5 0
2017-04-07 Multi-Stage Fracture 4511 4511.9 0
2017-04-07 Multi-Stage Fracture 4451.5 4452.4 0
2017-04-07 Multi-Stage Fracture 4391.9 4392.8 0
2017-04-07 Multi-Stage Fracture 4332.5 4333.4 0
2017-04-07 Multi-Stage Fracture 4272.9 4273.8 0
2017-04-07 Multi-Stage Fracture 4213.5 4214.4 0
2017-04-07 Multi-Stage Fracture 4154 4154.9 0
2017-04-07 Multi-Stage Fracture 4094.8 4095.7 0
2017-04-07 Multi-Stage Fracture 4035.1 4036 0
2017-04-07 Multi-Stage Fracture 3975.6 3976.5 0
2017-04-07 Multi-Stage Fracture 3916.1 3917 0
2017-04-08 Multi-Stage Fracture 3856.5 3857.4 0
2017-04-08 Multi-Stage Fracture 3797.4 3798.3 0
2017-04-08 Multi-Stage Fracture 3737.8 3738.7 0
2017-04-08 Multi-Stage Fracture 3678.2 3679.1 0
2017-04-08 Multi-Stage Fracture 3618.7 3619.6 0
2017-04-08 Multi-Stage Fracture 3559.8 3560.7 0
2017-04-08 Multi-Stage Fracture 3500.3 3501.2 0
2017-04-08 Multi-Stage Fracture 3440.8 3441.7 0
2017-04-08 Multi-Stage Fracture 3381.7 3382.6 0
2017-04-08 Multi-Stage Fracture 3322.5 3323.4 0
2017-04-08 Multi-Stage Fracture 3263 3263.9 0
2017-04-08 Multi-Stage Fracture 3214.9 3215.8 0
2017-04-08 Multi-Stage Fracture 3166.9 3167.8 0
2017-04-08 Multi-Stage Fracture 3119.2 3120.1 0
2017-04-08 Multi-Stage Fracture 3071.2 3072.1 0
2017-04-08 Multi-Stage Fracture 3023.2 3024.1 0
2017-04-08 Multi-Stage Fracture 2979.8 2980.8 0
2017-04-08 Multi-Stage Fracture 2933.1 2934.1 0
2017-04-08 Multi-Stage Fracture 2886.5 2887.5 0
2017-04-08 Multi-Stage Fracture 2839.7 2840.7 0
2017-04-08 Multi-Stage Fracture 2793.6 2794.6 0
2017-04-08 Multi-Stage Fracture 2747.6 2748.6 0
2017-04-08 Multi-Stage Fracture 2702.7 2703.7 0
2017-04-08 Multi-Stage Fracture 2656.7 2657.7 0
2017-04-08 Multi-Stage Fracture 2610.4 2611.4 0
2017-04-08 Multi-Stage Fracture 2564.5 2565.5 0
2017-04-08 Multi-Stage Fracture 2518.6 2519.6 0
2017-04-08 Multi-Stage Fracture 2473 2474 0
2017-04-08 Multi-Stage Fracture 2427.2 2428.2 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
04/06/2017 04/08/2017 Petroleum distillates 64742-47-8 Friction Reducer 0.0894 BJ Services
Crystalline Silica (Quartz) 14808-60-7 3.5059 BJ Services
Crystalline Silica (Quartz) 14808-60-7 3.5059 BJ Services
2.2-Dibromo-3-nitrilopropionamide 10222-01-2 Bactericide/Biocide 0.0083 BJ Services
Dibromoacetonitrile 3252-43-5 Bactericide/Biocide 0.0083 BJ Services
Polyethylene Glycol 25322-68-3 Bactericide/Biocide 0.0083 BJ Services
Sodium Bromide 7647-15-6 Bactericide/Biocide 0.0083 BJ Services
Water 7732-18-5 Bactericide/Biocide 0.0083 BJ Services
Sodium persulphate 7775-27-1 Breaker 0.0041 BJ Services
Non-hazardous 9014 Friction Reducer 0.0894 BJ Services
Oxyalkylated alcohol 9014 Friction Reducer 0.0894 BJ Services
Petroleum distillates 64742-47-8 Friction Reducer 0.0894 BJ Services
Polyacrylate 9014 Friction Reducer 0.0894 BJ Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
3/27/2017 4/15/2017 0:00 Recycled Fracturing Water (treated at independent stand-alone facility) 1086
3/3/2017 0 3/11/2017 0:00 Recycled Fracturing Water (treated at well site) 91
2/18/2017 2/24/2017 0:00 Surface Water - Runoff 2600

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5143 28509.6 0.0 0.0
2018 7767 17159.3 0.0 0.0
2019 2148 3265.3 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-26 No Incident N/A N/A
2017-04-08 No Incident N/A N/A
2018-03-07 No Incident N/A N/A

For data sources see[9]

References