X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625120809000

Well Details

Well ID: 0625120809000
Loading map...
Location: 00/09-08-062-12W5/0
Location Alias: 00/09-08-62-12 W5M
Location Alias 2: 00/09-08-062-12 W5/00
Province: Alberta
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 9-8-62-12
Operator Name: Accel Canada Holdings Limited
License Number: 0208086
License Date: 1997-11-07
License Status: Amended
Spud Date: 1998-02-18
Final Drill Date: 1998-03-03
Well Total Depth: 2735 m
Surface Hole Latitude: 54.349582
Surface Hole Longitude: -115.755444

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-03 Open Hole/Barefoot Completion 2681 2735 0
1998-03-30 Perforation 2660.6 2664 16
1998-03-30 Perforation 2655.6 2658.6 16
1998-03-30 Perforation 2652.6 2653.6 16
1998-03-30 Perforation 2649.4 2650.4 16
1998-03-30 Perforation 2645 2647.4 16
1998-03-30 Perforation 2641.5 2643 16
1998-03-30 Perforation 2628.5 2632 16
1998-03-30 Perforation 2624.5 2626.5 16
1998-03-30 Perforation 2621.5 2622.5 16
1998-04-01 Acid Treatment 2621.5 2664 0
1998-04-05 Acid Treatment 2621.5 2664 0
1998-05-22 Packing Device Capped w/Cement 2632 2640 0
2002-03-25 Perforation 2674 2677 17
2002-03-25 Perforation 2669 2671.2 17
2002-03-25 Perforation 2663.5 2669 17
2002-03-25 Perforation 2653.6 2655.6 17
2002-03-25 Perforation 2650.4 2652.6 17
2002-03-25 Perforation 2647.4 2649.4 17
2002-03-25 Perforation 2643.5 2645 17
2002-03-25 Perforation 2632 2633 17
2002-03-25 Perforation 2626.5 2628.5 17
2002-03-25 Perforation 2622.5 2624.5 17
2002-03-27 Acid Treatment 2674 2677 0
2002-03-27 Acid Treatment 2669 2671.2 0
2002-03-27 Acid Treatment 2663.5 2669 0
2002-03-27 Acid Treatment 2653.6 2655.6 0
2002-03-27 Acid Treatment 2650.4 2652.6 0
2002-03-27 Acid Treatment 2647.4 2649.4 0
2002-03-27 Acid Treatment 2643.5 2645 0
2002-03-27 Acid Treatment 2626.5 2628.5 0
2002-03-27 Acid Treatment 2622.5 2624.5 0
2008-12-06 Acid Treatment 2621.5 2735 0
2009-08-19 Acid Treatment 2621.5 2735 0
2011-02-16 Acid Treatment 2621.5 2735 0
2012-03-17 Acid Treatment 2621.5 2735 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 214197.1
2003 0 0.0 0.0 363424.5
2004 0 0.0 0.0 311515.7
2005 0 0.0 0.0 204992.8
2006 0 0.0 0.0 101884.6
2007 0 0.0 0.0 89684.4
2008 0 0.0 0.0 202647.1
2009 0 0.0 0.0 306528.4
2010 0 0.0 0.0 211061.6
2011 0 0.0 0.0 215239.3
2012 0 0.0 0.0 224719.3
2013 0 0.0 0.0 178840.8
2014 0 0.0 0.0 139158.7
2015 0 0.0 0.0 146661.5
2016 0 0.0 0.0 101457.3
2017 0 0.0 0.0 141610.9
2018 0 0.0 0.0 151332.3
2019 0 0.0 0.0 42590.8

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-02-24 Lost Circulation 1823.00 2218.00
2012-03-17 No Incident N/A N/A

For data sources see[5]

References