X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645100216000

Well Details

Well ID: 0645100216000
Loading map...
Location: 00/16-02-064-10W5/0
Location Alias: 00/16-02-64-10 W5M
Location Alias 2: 00/16-02-064-10 W5/00
Province: Alberta
County/Municipality: Big Lakes County
Well Name: CPEC HZ JUDYCK 16-2-64-10
Operator Name: Crescent Point Energy Corp.
License Number: 0443200
License Date: 2012-01-23
License Status: Issued
Spud Date: 2012-02-04
Final Drill Date: 2012-02-21
Well Total Depth: 4013 m
Surface Hole Latitude: 54.502801
Surface Hole Longitude: -115.386403

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
04 Feb 2012 Savanna Drilling Corp. 619 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-10 2380 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-22 Open Hole/Barefoot Completion 4011 4013 0
2012-03-22 Multi-Stage Fracture 3988.3 3988.4 0
2012-03-22 Multi-Stage Fracture 3936.9 3937 0
2012-03-22 Multi-Stage Fracture 3880.4 3880.5 0
2012-03-22 Multi-Stage Fracture 3729.2 3729.3 0
2012-03-22 Multi-Stage Fracture 3657.1 3657.2 0
2012-03-22 Multi-Stage Fracture 3581.7 3581.8 0
2012-03-22 Multi-Stage Fracture 3522.6 3522.7 0
2012-03-22 Multi-Stage Fracture 3420.3 3420.4 0
2012-03-22 Multi-Stage Fracture 3345.1 3345.2 0
2012-03-22 Multi-Stage Fracture 3229.6 3229.7 0
2012-03-22 Multi-Stage Fracture 3156.5 3156.6 0
2012-03-22 Multi-Stage Fracture 3067.6 3067.7 0
2012-03-22 Multi-Stage Fracture 2980.3 2980.4 0
2012-03-22 Multi-Stage Fracture 2895.1 2895.2 0
2012-03-22 Multi-Stage Fracture 2809.3 2809.4 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5105 1539.3 0.0 509.2
2013 6897 913.0 0.0 809.9
2014 8441 548.5 0.0 189.4
2015 8099 343.7 0.0 40.5
2016 6529 285.8 0.0 313.5
2017 7893 277.1 0.0 358.2
2018 8676 252.9 0.0 226.1
2019 2159 61.3 0.0 30.2

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-22 No Incident N/A N/A

For data sources see[7]

References