X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053104020

Well Details

Well ID: 0475053104020
Loading map...
Location: 02/04-31-047-05W5/0
Location Alias: 02/04-31-47-05 W5M
Location Alias 2: 02/04-31-047-05 W5/00
Province: Alberta
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 4-31-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0469529
License Date: 2014-09-04
License Status: Issued
Spud Date: 2014-10-15
Final Drill Date: 2014-10-22
Well Total Depth: 4004 m
Surface Hole Latitude: 53.115504
Surface Hole Longitude: -114.729786

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
15 Oct 2014 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-10-17 1126
2014-10-18 1609 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-07 Multi-Stage Fracture 3956.5 3957.4 0
2015-01-07 Multi-Stage Fracture 3905.8 3907.7 0
2015-01-07 Multi-Stage Fracture 3843.3 3845.2 0
2015-01-08 Multi-Stage Fracture 3792.4 3794.3 0
2015-01-08 Multi-Stage Fracture 3729.8 3731.7 0
2015-01-08 Multi-Stage Fracture 3678.8 3680.7 0
2015-01-08 Multi-Stage Fracture 3616.2 3618.1 0
2015-01-08 Multi-Stage Fracture 3565.3 3567.2 0
2015-01-08 Multi-Stage Fracture 3502.6 3504.5 0
2015-01-08 Multi-Stage Fracture 3451.7 3453.6 0
2015-01-08 Multi-Stage Fracture 3389.1 3391 0
2015-01-08 Multi-Stage Fracture 3338.2 3340.1 0
2015-01-08 Multi-Stage Fracture 3275.6 3277.5 0
2015-01-08 Multi-Stage Fracture 3224.7 3226.6 0
2015-01-08 Multi-Stage Fracture 3162.1 3164 0
2015-01-08 Multi-Stage Fracture 3111.3 3113.2 0
2015-01-08 Multi-Stage Fracture 3048.6 3050.5 0
2015-01-08 Multi-Stage Fracture 2997.7 2999.6 0
2015-01-08 Multi-Stage Fracture 2935.1 2937 0
2015-01-08 Multi-Stage Fracture 2884.2 2886.1 0
2015-01-08 Multi-Stage Fracture 2821.5 2823.4 0
2015-01-08 Multi-Stage Fracture 2770.6 2772.4 0
2015-01-08 Multi-Stage Fracture 2708 2709.9 0
2015-01-08 Multi-Stage Fracture 2657.1 2659 0
2015-01-08 Multi-Stage Fracture 2594.6 2596.5 0
2015-01-08 Multi-Stage Fracture 2542.3 2543.6 0
2015-01-08 Multi-Stage Fracture 2479.7 2480.9 0
2015-01-08 Multi-Stage Fracture 2430 2431.8 0
2015-01-08 Multi-Stage Fracture 2367.2 2369.1 0
2015-01-08 Multi-Stage Fracture 2315.1 2316.3 0
2015-01-08 Multi-Stage Fracture 2252.4 2253.6 0
2015-01-08 Multi-Stage Fracture 2202.7 2204.5 0
2015-01-08 Multi-Stage Fracture 2140 2141.9 0
2015-01-08 Multi-Stage Fracture 2089.2 2091.1 0
2015-01-09 Multi-Stage Fracture 2026.7 2028.6 0
2015-01-09 Multi-Stage Fracture 1975.8 1977.7 0
2015-01-09 Multi-Stage Fracture 1913.2 1915 0
2015-01-09 Multi-Stage Fracture 1862.2 1864.1 0
2015-01-09 Multi-Stage Fracture 1799.7 1801.6 0
2015-01-09 Multi-Stage Fracture 1748.7 1750.6 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
01/07/2015 01/09/2015 non-hazardous ingredients Not Available Bactericide/Biocide 0.0525 Trican
silica crystalline 14808-60-7 4.7554 Trican
silica crystalline 14808-60-7 0.3765 Trican
silica crystalline 14808-60-7 0.3765 Trican
2.2-dibromo-3-nitrilopropionamide 10222-01-2 Bactericide/Biocide 0.0525 Trican
dibromoacetonitrile 3252-43-5 Bactericide/Biocide 0.0525 Trican
non-hazardous ingredients Not Available Bactericide/Biocide 0.0525 Trican
polyethylene glycol 25322-68-3 Bactericide/Biocide 0.0525 Trican
sodium bromide 7647-15-6 Bactericide/Biocide 0.0525 Trican
non-hazardous ingredients Not Available Breaker 0.0018 Trican
propylene glycol 57-55-6 Breaker 0.0018 Trican
acetic acid 64-19-7 Buffer 0.0077 Trican
water Not Available Buffer 0.0077 Trican
1.6-hexanediamine. dihydrochloride 6055-52-3 Clay Control 0.3613 Trican
water Not Available Clay Control 0.3613 Trican
non-hazardous ingredients Not Available Demulsifier 0.0462 Trican
propylene glycol 57-55-6 Demulsifier 0.0462 Trican
non-hazardous ingredients Not Available Friction Reducer 0.1012 Trican
carboxymethyl hydroxypropyl guar 68130-15-4 Gelling Agent 0.0295 Trican
mineral oil Not Available Gelling Agent 0.0295 Trican
non-hazardous ingredients Not Available Scale Inhibitor 0.004 Trican

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/18/2014 1/10/2015 0:00 Oilfield Produced Water 2327

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7928 1322.6 0.0 0.0
2016 8727 1298.1 0.0 0.0
2017 8667 723.7 0.0 37.5
2018 8605 541.3 0.0 51.3
2019 2159 127.4 0.0 12.2

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-24 No Incident N/A N/A
2015-01-09 No Incident N/A N/A

For data sources see[9]

References