X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746082607000

Well Details

Well ID: 0746082607000
Loading map...
Location: 00/07-26-074-08W6/0
Location Alias: 00/07-26-74-08 W6M
Location Alias 2: 00/07-26-074-08 W6/00
Province: Alberta
County/Municipality: County of Grande Prairie No. 1
Well Name: ARCO LA GLACE 7-26-74-8
Operator Name:
License Number: 0007897
License Date: 1954-04-01
License Status: RecCertified
Spud Date: 1954-05-24
Final Drill Date: 1954-10-28
Well Total Depth: 2746.2 m
Surface Hole Latitude: 55.437523
Surface Hole Longitude: -119.111782

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-01 Perforation 2421.9 2426.2 13
1954-11-03 Cement Squeeze 2421.9 2426.2 0
1954-11-06 Perforation 2351.2 2353.7 13
1954-11-09 Cement Squeeze 2351.2 2353.7 0
1954-11-11 Cement Squeeze 2351.2 2353.7 0
1954-11-13 Perforation 2339 2339.3 13
1954-11-14 Cement Squeeze 2339 2339.3 0
1954-11-15 Acid Treatment 2339 2339.3 0
1954-11-16 Cement Squeeze 2339 2339.3 0
1954-12-04 Perforation 2344.8 2345.7 0
1954-12-06 Perforation 2343.3 2344.5 13
1954-12-06 Acid Treatment 2343.3 2345.7 0
1954-12-09 Perforation 2311.6 2315.3 13
1954-12-10 Cement Squeeze 2311.6 2345.7 0
1954-12-13 Perforation 2304.9 2307.9 13
1954-12-14 Cement Squeeze 2304.9 2307.9 0
1954-12-16 Perforation 2300.9 2304.6 13
1954-12-17 Packing Device Capped w/Cement 1898.9 1898.9 0
1954-12-17 Perforation 1887.9 1888.2 13
1954-12-18 Perforation 1883.7 1887.9 13
1954-12-19 Acid Treatment 1883.7 1888.2 0
1954-12-21 Packing Device Capped w/Cement 1868.4 1868.4 0
1954-12-21 Perforation 1861.1 1861.4 13
1954-12-23 Cement Squeeze 1861.1 1861.4 0
1954-12-28 Perforation 1856.8 1858.1 13
1954-12-28 Perforation 1859.3 1861.4 13
1954-12-31 Acid Treatment 1856.8 1861.4 0
1955-01-01 Cement Plug 1773.6 1781.6 0
1955-01-03 Selective Jet Perforation 1766.3 1766.6 0
1955-01-03 Cement Squeeze 1766.3 1766.6 0
1955-01-06 Perforation 1755 1756.3 13
1955-01-06 Perforation 1756.9 1757.5 13
1955-01-06 Perforation 1758.1 1766.6 13
1955-01-07 Fracture 1755 1766.6 0
1955-01-18 Cement Squeeze 1755 1766.6 0
1955-01-24 Perforation 1856.8 1861.4 13
1955-01-24 Acid Treatment 1856.8 1861.4 0
1955-01-30 Acid Treatment 1856.8 1861.4 0
1957-05-28 Acid Treatment 1856.8 1861.4 0
1957-06-28 Perforation 1855 1860.2 13
1957-07-02 Selective Jet Perforation 1860.2 1862.3 13
1957-07-04 Fracture 1855 1862.3 0
1963-11-29 Cement Plug 775.1 811.1 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 69.5 0.0 0.0

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1954-06-03 Lost Circulation 725.10 725.10

For data sources see[5]

References