If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36247 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.440107,"lon":-79.091516,"icon":""}]} |
Operator Name: PENN VIEW EXPLORATION CORP | |
First Permit Date: 2008-09-30 | |
Last Permit Date: 2008-09-30 | |
Spud Date: 2009-01-27 | |
Unconventional: No | |
Horizontal: No | |
Violations: 3 | |
Latitude: 40.440107 | |
Longitude: -79.091516 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 13094.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 12647.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 9642.4 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 12868.0 | 307.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2012-0 | PRODUCED FLUID | 75.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2013-0 | PRODUCED FLUID | 85.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1735737 | 2008-09-11 | No Violations Noted | well staked - site not made/waiver ok | |
1768266 | 2009-01-29 | No Violations Noted | Drilling 12 1/4" 330' Pit & E&S OK | |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560056 |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560056 |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560068 |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560068 |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560069 |
1781766 | 2009-02-09 | Violation(s) Noted | Drilling had been completed at the time of the inspection. The well was not equipped for production. The following deficiencies were found at this site: 1- The site was not constructed according to the E&S plan that was on-site. Because this site has a waiver, the approved E&S plan should be followed and any changes should be discussed with the Department prior to implementation.
2- The grub/brush line was installed on the wrong side of the silt fence. 3- There were several instances of failing filter fence. 4- The access road could use additional BMP¿s to limit the amount of sediment entering the stream. 5- The pit installation that was observed at the site could cause undue stress to the integrity of the pit liner and could lead to a tear. |
560069 |
1781836 | 2009-04-06 | No Violations Noted | This inspection was performed as a Compliance Evaluation to a NOV that was issued on 2/9/09.
3/2/09- Written response was received from the operator. 4/6/09- Jarrod Shultz performed an inspection of the well site. The well site was equipped for production. The E&S plan has been revised to include any changes from the original plan. The filter fence has been repaired and/or replaced where it was needed. Additional E&S controls (silt fence, hay bales, and seeding & mulching) were added to the access road to assist in controlling Erosion and Sedimentation. With proper maintenance, the current E&S controls should properly limit erosion and sedimentation of the site and access road. |
|
1817415 | 2009-07-31 | No Violations Noted | According to records, well completed on 2/5/09 to a depth of 5,037 ft and WRAC submitted on 4/28/09. Active permit since 9/30/09. Well head completed with 7¿ pipe reduced to 4¿ and reduced to 2¿ production line with 3 shut off valves. Production equipment consisted of heater, separator, data logger and 100 bbl tank. Line pressure on separator at 125 psi. No E&S issues and no IW issues during inspection surrounding the production well. The main access road to well will require additional E&S activity. Discussed topic with Penn View, Rick Blazek. | |
1817964 | 2009-08-03 | No Violations Noted | Drilling was completed on 2/5/2009. There are on E&S issues on the site at the time of inspection. Brine tank is in sound condition. Well is in production and site is restored. There is approximately 95% perrenial vegetative cover at the well site. | |
1965291 | 2011-04-13 | No Violations Noted | At the time of inspection, well drilled and in production. Well completed on 02/05/09. Well tag present. Site adequately and uniformly restored with >70% vegetative cover. Brine tank appears sound. No accelerated ES issues or IW issues noted on site.
Minor ES issues noted along shared access road due to new construction of Krause 1 site (Spud called for 3/30/11), which are addressed accordingly in Krause 1 site inspection; therefore operator should continue maintain shared access road accordingly. |
|
2154420 | 2013-04-02 | Indiana | West Wheatfield Twp | No Violations Noted |