X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244142205000

Well Details

Well ID: 0244142205000
Loading map...
Location: 00/05-22-024-14W4/0
Location Alias: 00/05-22-24-14 W4M
Location Alias 2: 00/05-22-024-14 W4/00
Province: Alberta
County/Municipality: Special Area No. 2
Well Name: WEST VALLEY HZ MATZ 5-22-24-14
Operator Name: Cor4 Oil Corp.
License Number: 0458245
License Date: 2013-07-23
License Status: Suspension
Spud Date: 2013-08-08
Final Drill Date: 2013-08-18
Well Total Depth: 2153.5 m
Surface Hole Latitude: 51.067563
Surface Hole Longitude: -111.884167

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
08 Aug 2013 Precision Drilling Corporation 159 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-08-10 762
2013-08-10 1271 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-13 Multi-Stage Fracture 2132.8 2132.9 0
2013-09-13 Multi-Stage Fracture 2099.3 2099.4 0
2013-09-13 Multi-Stage Fracture 2051.9 2052 0
2013-09-13 Multi-Stage Fracture 1990.7 1990.8 0
2013-09-13 Multi-Stage Fracture 1943.3 1943.4 0
2013-09-14 Multi-Stage Fracture 1895.9 1896 0
2013-09-14 Multi-Stage Fracture 1834.8 1834.9 0
2013-09-14 Multi-Stage Fracture 1787.4 1787.5 0
2013-09-14 Multi-Stage Fracture 1753.9 1754 0
2013-09-21 Multi-Stage Fracture 1706.6 1706.7 0
2013-09-21 Multi-Stage Fracture 1659.2 1659.3 0
2013-09-21 Multi-Stage Fracture 1611.9 1612 0
2013-09-21 Multi-Stage Fracture 1564.5 1564.6 0
2013-09-21 Multi-Stage Fracture 1517.2 1517.3 0
2013-09-21 Multi-Stage Fracture 1483.6 1483.7 0
2013-09-21 Multi-Stage Fracture 1436.2 1436.3 0
2013-09-21 Multi-Stage Fracture 1388.7 1388.8 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
09/13/2013 09/21/2013 Sulphonic acid. alkyl aryl derivative 147732-59-0 Demulsifier 0.0019 Baker Hughes
Crystalline Silica (Quartz) 14808-60-7 0.8278 Baker Hughes
Crystalline Silica (Quartz) 14808-60-7 0.8278 Baker Hughes
Hydrochloric acid 7647-01-0 Acid 1.0447 Baker Hughes
Water 7732-18-5 Acid 1.0447 Baker Hughes
Didecyl dimethyl ammonium chloride 7173-51-5 Bactericide/Biocide 0.159 Baker Hughes
Ethanol 64-17-5 Bactericide/Biocide 0.159 Baker Hughes
Methanol 67-56-1 Bactericide/Biocide 0.159 Baker Hughes
Water 7732-18-5 Bactericide/Biocide 0.159 Baker Hughes
Methanol 67-56-1 Corrosion Inhibitor 0.0038 Baker Hughes
Non-hazardous Not Available Corrosion Inhibitor 0.0038 Baker Hughes
Potassium iodide 7681-11-0 Corrosion Inhibitor 0.0038 Baker Hughes
Formaldehyde 50-00-0 Corrosion Inhibitor 0.0146 Baker Hughes
Non-hazardous Not Available Corrosion Inhibitor 0.0146 Baker Hughes
Propargyl alcohol 107-19-7 Corrosion Inhibitor 0.0146 Baker Hughes
Non-hazardous Not Available Defoamer 0 Baker Hughes
Octamethylcyclotetrasiloxane 556-67-2 Defoamer 0.0001 Baker Hughes
Methanol 67-56-1 Demulsifier 0.0019 Baker Hughes
Sulphonic acid. alkyl aryl derivative 147732-59-0 Demulsifier 0.0019 Baker Hughes
Sulphuric acid 7664-93-9 Demulsifier 0.0019 Baker Hughes
Benzene sulphonate derivative 147732-60-3 Demulsifier 0.021 Baker Hughes
Benzenesulphonic acid. C10-16-alkyl derivatives 68584-22-5 Demulsifier 0.021 Baker Hughes
Dipropylene glycol 25265-71-8 Demulsifier 0.021 Baker Hughes
Non-hazardous Not Available Demulsifier 0.021 Baker Hughes
Distillates. hydrotreated middle. petroleum 64742-46-7 Friction Reducer 0.1058 Baker Hughes
Non-hazardous Not Available Friction Reducer 0.1058 Baker Hughes
Sodium hypophosphite 10039-56-2 Iron Control 0.0205 Baker Hughes
Cupric sulphate. pentahydrate 7758-99-8 Iron Control 0.0012 Baker Hughes

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
8/30/2013 9/21/2013 0:00 Oilfield Produced Water 500
8/30/2013 9/21/2013 0:00 Recycled Fracturing Water (treated at well site) 5000

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1619 808.1 0.0 7975.8
2014 3117 991.6 0.0 14559.5

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-15 Lost Circulation 1422.40 1422.40
2013-09-08 No Incident N/A N/A

For data sources see[9]

References