If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445143306004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.833821,"lon":-115.977208,"icon":""}]} |
Location: 00/06-33-044-14W5/4 | |
Location Alias: 00/06-33-44-14 W5M | |
Location Alias 2: 00/06-33-044-14 W5/04 | |
Province: Alberta | |
County/Municipality: Clearwater County | |
Well Name: FAIRBORNE HARLECH 6-33-44-14 | |
Operator Name: | |
License Number: 0313160 | |
License Date: 2004-08-11 | |
License Status: Issued | |
Spud Date: 2004-09-17 | |
Final Drill Date: 2004-10-08 | |
Well Total Depth: 3080 m | |
Surface Hole Latitude: 52.833821 | |
Surface Hole Longitude: -115.977208 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-08 | Perforation | 3051 | 3054 | 20 |
2004-11-10 | Fracture | 3051 | 3054 | 0 |
2004-11-16 | Packing Dev Cpd w/Res-Gyp Cem | 3042 | 3045 | 0 |
2004-11-18 | Perforation | 2962 | 2965.5 | 20 |
2004-11-20 | Fracture | 2962 | 2965.5 | 0 |
2004-11-24 | Perforation | 2874 | 2880 | 17 |
2004-11-28 | Fracture | 2874 | 2880 | 0 |
2005-06-19 | Perforation | 1699 | 1704 | 17 |
2005-06-19 | Perforation | 1693 | 1697 | 17 |
2005-06-21 | Fracture | 1693 | 1697 | 0 |
2005-06-21 | Fracture | 1699 | 1704 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4132 | 6610.2 | 0.0 | 11.3 |
2006 | 5083 | 2272.2 | 0.0 | 10.3 |
2010 | 1463 | 889.1 | 0.0 | 4.1 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2004-10-10 | Kick | 2915.00 | 2915.00 |
2004-10-12 | Lost Circulation | 3030.00 | 3030.00 |
2004-10-13 | Lost Circulation | 1344.00 | 1344.00 |
2004-10-14 | Lost Circulation | 2562.00 | 2562.00 |
For data sources see[5]