If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364201402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.086109,"lon":-112.751151,"icon":""}]} |
Location: 00/02-14-036-20W4/0 | |
Location Alias: 00/02-14-36-20 W4M | |
Location Alias 2: 00/02-14-036-20 W4/00 | |
Province: Alberta | |
County/Municipality: County of Stettler No. 6 | |
Well Name: TRIWASTE CAPRONA 2-14-36-20 | |
Operator Name: | |
License Number: 0007553 | |
License Date: 1954-01-05 | |
License Status: RecCertified | |
Spud Date: 1954-05-23 | |
Final Drill Date: 1954-06-12 | |
Well Total Depth: 1676.7 m | |
Surface Hole Latitude: 52.086109 | |
Surface Hole Longitude: -112.751151 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-06-15 | Open Hole/Barefoot Completion | 1600.2 | 1605.1 | 0 |
1954-06-15 | Acid Treatment | 1600.2 | 1605.1 | 0 |
1973-11-21 | Cement Squeeze | 1600.2 | 1605.1 | 0 |
1973-11-27 | Perforation | 1650.5 | 1662.7 | 7 |
1973-11-27 | Acid Treatment | 1650.5 | 1662.7 | 0 |
1995-07-14 | Packing Device Capped w/Cement | 1527 | 1535 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 2040.0 | 0.0 | 35.9 |
1962 | 0 | 208.6 | 0.0 | 0.0 |
1963 | 0 | 207.5 | 0.0 | 0.0 |
1964 | 0 | 176.6 | 0.0 | 0.0 |
1965 | 0 | 101.8 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 53.9 |
For data sources see[4]