X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234263205000

Well Details

Well ID: 0234263205000
Loading map...
Location: 00/05-32-023-26W4/0
Location Alias: 00/05-32-23-26 W4M
Location Alias 2: 00/05-32-023-26 W4/00
Province: Alberta
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-32-23-26
Operator Name:
License Number: 0425484
License Date: 2010-11-03
License Status: Amended
Spud Date: 2010-11-10
Final Drill Date: 2010-11-11
Well Total Depth: 993 m
Surface Hole Latitude: 50.994678
Surface Hole Longitude: -113.608149

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2010-11-10 0

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-04 Perforation 726.5 728.5 13
2010-12-04 Perforation 311 313 13
2010-12-10 Fracture 726.5 728.5 0
2010-12-10 Fracture 311 313 0
2011-01-03 Perforation 552.9 553.4 13
2011-01-03 Perforation 597.7 598.2 13
2011-01-03 Perforation 534.2 534.7 13
2011-01-03 Perforation 543.3 544.3 13
2011-01-03 Perforation 653.2 653.7 13
2011-01-03 Perforation 656.3 656.8 13
2011-01-03 Perforation 629.2 629.7 13
2011-01-03 Perforation 640 642 13
2011-01-03 Perforation 609.5 611.5 13
2011-01-03 Perforation 773 775 13
2011-01-03 Perforation 363.5 365.5 13
2011-01-03 Perforation 391.5 393.5 13
2011-01-03 Perforation 518.2 519.2 13
2011-01-03 Perforation 523.8 524.3 13
2011-01-03 Perforation 904 906 13
2011-01-03 Perforation 431.6 432.1 13
2011-01-03 Perforation 657.4 658.4 13
2011-01-03 Perforation 802.2 804.2 13
2011-01-03 Perforation 806.9 807.9 13
2011-01-03 Perforation 788.5 789.5 13
2011-01-03 Perforation 799 800 13
2011-01-03 Perforation 849.1 849.6 13
2011-01-03 Perforation 973.3 973.8 13
2011-01-03 Perforation 810.1 810.6 13
2011-01-03 Perforation 846.3 846.8 13
2011-01-03 Perforation 678.6 679.6 13
2011-01-03 Perforation 689.5 690 13
2011-01-03 Perforation 665.3 666.3 13
2011-01-03 Perforation 669.7 670.7 13
2011-01-03 Perforation 701.6 703.6 13
2011-01-03 Perforation 783 784 13
2011-01-03 Perforation 712.3 712.8 13
2011-01-03 Perforation 716.3 716.8 13
2011-01-26 Fracture 363.5 906 0
2011-01-26 Fracture 431.6 973.8 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4 0.2 0.0 0.0

For data sources see[5]

References