X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234262805000

Well Details

Well ID: 0234262805000
Loading map...
Location: 00/05-28-023-26W4/0
Location Alias: 00/05-28-23-26 W4M
Location Alias 2: 00/05-28-023-26 W4/00
Province: Alberta
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-28-23-26
Operator Name: Ember Resources Inc.
License Number: 0354327
License Date: 2006-03-17
License Status: Issued
Spud Date: 2006-03-22
Final Drill Date: 2007-01-10
Well Total Depth: 1061 m
Surface Hole Latitude: 50.986585
Surface Hole Longitude: -113.581459

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-05 Perforation 888 889 13
2007-02-11 Fracture 888 889 0
2009-08-25 Perforation 448.6 449.1 13
2009-08-25 Perforation 494.3 494.8 13
2009-08-25 Perforation 378.9 379.4 13
2009-08-25 Perforation 382.8 383.8 13
2009-08-25 Perforation 498.1 500.1 13
2009-08-25 Perforation 510.1 510.6 13
2009-08-25 Perforation 511.9 512.4 13
2009-08-25 Perforation 500.3 500.8 13
2009-08-25 Perforation 504.4 504.9 13
2009-08-25 Perforation 419 420 13
2009-08-25 Perforation 437 438 13
2009-08-25 Perforation 278 279 13
2009-08-25 Perforation 283 285 13
2009-08-25 Perforation 455 456 13
2009-08-25 Perforation 617 618 13
2009-08-25 Perforation 376.1 376.6 13
2009-08-25 Perforation 496 497 13
2009-08-25 Perforation 584 585 13
2009-08-25 Perforation 514.8 515.8 13
2009-08-25 Perforation 633 634 13
2009-08-25 Perforation 636.5 637 13
2009-08-25 Perforation 628.4 629.4 13
2009-08-25 Perforation 630.9 631.4 13
2009-08-25 Perforation 683.6 684.1 13
2009-08-25 Perforation 738.5 739.5 13
2009-08-25 Perforation 674.3 674.8 13
2009-08-25 Perforation 679.3 679.8 13
2009-08-25 Perforation 623.3 624.3 13
2009-08-25 Perforation 549.9 550.4 13
2009-08-25 Perforation 553.4 553.9 13
2009-08-25 Perforation 534.8 535.3 13
2009-08-25 Perforation 539.6 540.6 13
2009-08-25 Perforation 560 560.5 13
2009-08-25 Perforation 613.3 613.8 13
2009-08-25 Perforation 607.9 608.9 13
2009-08-25 Perforation 594.9 595.4 13
2009-09-01 Fracture 455 456 0
2009-09-01 Fracture 437 438 0
2009-09-01 Fracture 278 285 0
2009-09-01 Fracture 419 420 0
2009-09-01 Fracture 496 497 0
2009-09-01 Fracture 738.5 739.5 0
2009-09-01 Fracture 376.1 684.1 0
2009-09-01 Fracture 584 585 0
2009-09-01 Fracture 617 618 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7514 277.4 0.0 1.5
2008 8649 142.7 0.0 0.0
2009 8759 74.0 0.0 0.3
2010 8759 135.3 0.0 0.6
2011 8758 186.8 0.0 1.8
2012 8759 60.1 0.0 1.2
2013 8740 132.2 0.0 0.8
2014 8710 129.8 0.0 0.0
2015 8678 125.6 0.0 1.4
2016 8653 126.5 0.0 1.2
2017 8658 120.1 0.0 0.0
2018 8514 122.5 0.0 0.0
2019 2150 28.4 0.0 0.0

For data sources see[4]

References