X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535130913000

Well Details

Well ID: 0535130913000
Loading map...
Location: 00/13-09-053-13W5/0
Location Alias: 00/13-09-53-13 W5M
Location Alias 2: 00/13-09-053-13 W5/00
Province: Alberta
County/Municipality: Yellowhead County
Well Name: VEI HZ CARROT 13-9-53-13
Operator Name: Vermilion Energy Inc.
License Number: 0493690
License Date: 2019-02-06
License Status: Amended
Spud Date: 2019-02-15
Final Drill Date: 2019-02-25
Well Total Depth: 4172 m
Surface Hole Latitude: 53.585475
Surface Hole Longitude: -115.854317

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2019-02-19 1888
2019-02-20 2258 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-07 Open Hole/Barefoot Completion 4131 4172 0
2019-03-08 Multi-Stage Fracture 4051.1 4051.2 0
2019-03-08 Multi-Stage Fracture 3979.8 3979.9 0
2019-03-08 Multi-Stage Fracture 3910.4 3910.5 0
2019-03-08 Multi-Stage Fracture 3841 3841.1 0
2019-03-08 Multi-Stage Fracture 3771.5 3771.6 0
2019-03-08 Multi-Stage Fracture 3702.2 3702.3 0
2019-03-08 Multi-Stage Fracture 3632.7 3632.8 0
2019-03-08 Multi-Stage Fracture 3563.2 3563.3 0
2019-03-08 Multi-Stage Fracture 3497.2 3497.3 0
2019-03-08 Multi-Stage Fracture 3427.7 3427.8 0
2019-03-08 Multi-Stage Fracture 3358.3 3358.4 0
2019-03-08 Multi-Stage Fracture 3289 3289.1 0
2019-03-08 Multi-Stage Fracture 3219.5 3219.6 0
2019-03-08 Multi-Stage Fracture 3150 3150.1 0
2019-03-08 Multi-Stage Fracture 3080.4 3080.5 0
2019-03-08 Multi-Stage Fracture 3010.8 3010.9 0
2019-03-08 Multi-Stage Fracture 2941.5 2941.6 0
2019-03-08 Multi-Stage Fracture 2872.1 2872.2 0
2019-03-08 Multi-Stage Fracture 2802.5 2802.6 0
2019-03-08 Multi-Stage Fracture 2746.5 2746.6 0
2019-03-08 Multi-Stage Fracture 2690.6 2690.7 0
2019-03-08 Multi-Stage Fracture 2634.5 2634.6 0
2019-03-08 Multi-Stage Fracture 2578.5 2578.6 0
2019-03-08 Multi-Stage Fracture 2522.4 2522.5 0
2019-03-08 Multi-Stage Fracture 2466.5 2466.6 0
2019-03-08 Multi-Stage Fracture 2410.5 2410.6 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 86 317.6 0.0 370.4

For data sources see[5]

References