X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706082212020

Well Details

Well ID: 0706082212020
Loading map...
Location: 02/12-22-070-08W6/0
Location Alias: 02/12-22-70-08 W6M
Location Alias 2: 02/12-22-070-08 W6/00
Province: Alberta
County/Municipality: County of Grande Prairie No. 1
Well Name: PIPESTONE 102 HZ ELM 12-22-70-8
Operator Name:
License Number: 0488313
License Date: 2018-02-15
License Status: Issued
Spud Date: 2018-02-19
Final Drill Date: 2018-05-27
Well Total Depth: 5267 m
Surface Hole Latitude: 55.067904
Surface Hole Longitude: -119.103819

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
13 May 2018 Citadel Drilling Ltd. 3 N/A Resumption
19 Feb 2018 Citadel Drilling Ltd. 3 N/A Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-05-14 1410
2018-05-18 2626 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-01 Multi-Stage Fracture 5251.8 5255.2 0
2018-10-02 Multi-Stage Fracture 5154.4 5230 0
2018-10-02 Multi-Stage Fracture 5066.8 5142.5 0
2018-10-13 Multi-Stage Fracture 4978.5 5054.5 0
2018-10-14 Multi-Stage Fracture 4890.3 4966.2 0
2018-10-14 Multi-Stage Fracture 4802 4878 0
2018-10-14 Multi-Stage Fracture 4713.7 4789.7 0
2018-10-15 Multi-Stage Fracture 4625.4 4701.4 0
2018-10-15 Multi-Stage Fracture 4537.5 4613.1 0
2018-10-15 Multi-Stage Fracture 4449.5 4525.2 0
2018-10-16 Multi-Stage Fracture 4361.6 4437.1 0
2018-10-16 Multi-Stage Fracture 4273.4 4349.3 0
2018-10-16 Multi-Stage Fracture 4185.1 4261.1 0
2018-10-17 Multi-Stage Fracture 4098 4172.8 0
2018-10-17 Multi-Stage Fracture 4010 4085.7 0
2018-10-18 Multi-Stage Fracture 3921.8 3977.6 0
2018-10-18 Multi-Stage Fracture 3833.9 3909.7 0
2018-10-18 Multi-Stage Fracture 3746.1 3821.7 0
2018-10-19 Multi-Stage Fracture 3657.8 3733.8 0
2018-10-19 Multi-Stage Fracture 3569.4 3645.4 0
2018-10-19 Multi-Stage Fracture 3481.1 3557.1 0
2018-10-19 Multi-Stage Fracture 3392.7 3468.7 0
2018-10-19 Multi-Stage Fracture 3304.6 3380.4 0
2018-10-20 Multi-Stage Fracture 3216.4 3292.4 0
2018-10-20 Multi-Stage Fracture 3128 3204.1 0
2018-10-20 Multi-Stage Fracture 3039.7 3115.7 0
2018-10-20 Multi-Stage Fracture 2951.3 3027.3 0
2018-10-20 Multi-Stage Fracture 2850.8 2939 0
2018-10-20 Multi-Stage Fracture 2749.8 2838.5 0
2018-10-21 Multi-Stage Fracture 2648.9 2737.5 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
10/01/2018 10/21/2018 Methyl Alcohol 67-56-1 Acid 0.0066 Step Energy Services
Methyl Alcohol 67-56-1 Acid 0.0012 Step Energy Services
10/02/2018 10/21/2018 Crystalline Silica 14808-60-7 23.148 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
10/1/2018 12/9/2018 0:00 Surface Water - River 21921

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 131 792.2 0.0 0.0

For data sources see[8]

References