X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705111412000

Well Details

Well ID: 0705111412000
Loading map...
Location: 00/12-14-070-11W5/0
Location Alias: 00/12-14-70-11 W5M
Location Alias 2: 00/12-14-070-11 W5/00
Province: Alberta
County/Municipality: Big Lakes County
Well Name: ACL CALSTAN SOBC SWANH 12-14-70-11
Operator Name:
License Number: 0028293
License Date: 1965-05-27
License Status: Abandoned
Spud Date: 1965-07-09
Final Drill Date: 1965-08-07
Well Total Depth: 2447.5 m
Surface Hole Latitude: 55.063246
Surface Hole Longitude: -115.574163

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-06 Perforation 2405.2 2406.4 3
1965-08-06 Perforation 2407 2408.2 3
1965-08-06 Perforation 2409.1 2409.7 3
1965-08-06 Perforation 2410.4 2411 3
1965-08-06 Selective Jet Perforation 2413.4 2414.3 0
1965-08-06 Selective Jet Perforation 2414.9 2417.1 0
1965-08-06 Selective Jet Perforation 2417.4 2418 0
1965-08-06 Selective Jet Perforation 2418.3 2418.9 0
1965-08-06 Selective Jet Perforation 2418.9 2419.5 0
1965-08-06 Selective Jet Perforation 2426.5 2426.8 0
1965-08-07 Acid Treatment 2405.2 2426.8 0
1965-08-08 Acid Treatment 2405.2 2426.8 0
2013-02-06 Packing Device Capped w/Cement 2392 2400 0
2013-02-07 Packing Device Capped w/Cement 1840 1848 0
2013-02-07 Packing Device Capped w/Cement 1724 1732 0
2013-02-08 Perforation 994 995 20
2013-02-09 Remedial Casing Cementing 994 995 0
2013-02-09 Packing Device Capped w/Cement 984 992 0
2013-02-10 Perforation 785 786 20
2013-02-10 Packing Device Capped w/Cement 775 780 0
2013-02-10 Perforation 515 516 20
2013-02-11 Remedial Casing Cementing 515 516 0
2013-02-11 Packing Device Capped w/Cement 505 513 0
2013-02-11 Perforation 226 227 20
2013-02-11 Remedial Casing Cementing 226 227 0
2013-02-11 Packing Device Capped w/Cement 214 222 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 104.4 0.0 0.0
1966 0 305.9 0.0 0.0
1967 744 193.3 0.0 0.0
1968 3695 274.5 0.0 0.0
1969 7751 382.5 0.0 0.0
1970 7582 371.4 0.0 0.0
1971 8751 275.7 0.0 0.0
1972 7975 257.4 0.0 99.4
1973 7030 244.0 0.0 1519.3
1974 7856 310.1 0.0 1816.2
1975 7226 210.3 0.0 2771.1
1976 7890 321.1 0.0 2287.8
1977 8658 231.8 0.0 3943.9
1978 6750 159.7 0.0 2795.9
1979 7151 114.2 0.0 2920.9
1980 7684 110.2 0.0 2156.4
1981 6704 80.9 0.0 1926.7
1982 7166 64.1 0.0 3221.8
1983 8030 88.4 0.0 4761.9
1984 7725 45.9 0.0 3336.5
1985 7291 38.2 0.0 3540.5
1986 7535 46.5 0.0 3321.7
1987 7628 36.2 0.0 3359.8
1988 5838 26.7 0.0 2869.1
1989 1560 5.2 0.0 699.2
1990 744 2.6 0.0 317.0

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-14 No Incident N/A N/A

For data sources see[5]

References