X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354093504020

Well Details

Well ID: 0354093504020
Loading map...
Location: 02/04-35-035-09W4/0
Location Alias: 02/04-35-35-09 W4M
Location Alias 2: 02/04-35-035-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 102 HZ PROVOST 4-35-35-9
Operator Name: Karve Energy Inc.
License Number: 0489585
License Date: 2018-06-15
License Status: Issued
Spud Date: 2018-07-18
Final Drill Date: 2018-07-20
Well Total Depth: 1629 m
Surface Hole Latitude: 52.041812
Surface Hole Longitude: -111.181331

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
18 Jul 2018 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-19 637
2018-07-20 1000 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-31 Multi-Stage Fracture 1592.4 1592.5 0
2018-07-31 Multi-Stage Fracture 1569.1 1569.2 0
2018-07-31 Multi-Stage Fracture 1545.5 1545.6 0
2018-07-31 Multi-Stage Fracture 1522 1522.1 0
2018-07-31 Multi-Stage Fracture 1498.5 1498.6 0
2018-07-31 Multi-Stage Fracture 1474.9 1475 0
2018-07-31 Multi-Stage Fracture 1451.6 1451.7 0
2018-07-31 Multi-Stage Fracture 1371.8 1371.9 0
2018-07-31 Multi-Stage Fracture 1348.4 1348.5 0
2018-07-31 Multi-Stage Fracture 1325.5 1325.6 0
2018-07-31 Multi-Stage Fracture 1302 1302.1 0
2018-07-31 Multi-Stage Fracture 1267 1267.1 0
2018-07-31 Multi-Stage Fracture 1244.1 1244.2 0
2018-07-31 Multi-Stage Fracture 1220.8 1220.9 0
2018-07-31 Multi-Stage Fracture 1197.5 1197.6 0
2018-07-31 Multi-Stage Fracture 1174.5 1174.6 0
2018-07-31 Multi-Stage Fracture 1150.9 1151 0
2018-07-31 Multi-Stage Fracture 1127.9 1128 0
2018-07-31 Multi-Stage Fracture 1104.5 1104.6 0
2018-07-31 Multi-Stage Fracture 1080.8 1080.9 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
07/31/2018 07/31/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0113 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
7/25/2018 7/25/2018 0:00 Central Water Distribution Facility 84
7/25/2018 7/25/2018 0:00 Municipal Water 434

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3358 162.6 0.0 825.0
2019 2150 63.5 0.0 434.5

For data sources see[8]

References