If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354093504020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.041812,"lon":-111.181331,"icon":""}]} |
Location: 02/04-35-035-09W4/0 | |
Location Alias: 02/04-35-35-09 W4M | |
Location Alias 2: 02/04-35-035-09 W4/00 | |
Province: Alberta | |
County/Municipality: Special Area No. 4 | |
Well Name: KARVE 102 HZ PROVOST 4-35-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0489585 | |
License Date: 2018-06-15 | |
License Status: Issued | |
Spud Date: 2018-07-18 | |
Final Drill Date: 2018-07-20 | |
Well Total Depth: 1629 m | |
Surface Hole Latitude: 52.041812 | |
Surface Hole Longitude: -111.181331 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
18 Jul 2018 | Ensign Drilling Inc. | 348 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-07-19 | 637 | |
2018-07-20 | 1000 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-07-31 | Multi-Stage Fracture | 1592.4 | 1592.5 | 0 |
2018-07-31 | Multi-Stage Fracture | 1569.1 | 1569.2 | 0 |
2018-07-31 | Multi-Stage Fracture | 1545.5 | 1545.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1522 | 1522.1 | 0 |
2018-07-31 | Multi-Stage Fracture | 1498.5 | 1498.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1474.9 | 1475 | 0 |
2018-07-31 | Multi-Stage Fracture | 1451.6 | 1451.7 | 0 |
2018-07-31 | Multi-Stage Fracture | 1371.8 | 1371.9 | 0 |
2018-07-31 | Multi-Stage Fracture | 1348.4 | 1348.5 | 0 |
2018-07-31 | Multi-Stage Fracture | 1325.5 | 1325.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1302 | 1302.1 | 0 |
2018-07-31 | Multi-Stage Fracture | 1267 | 1267.1 | 0 |
2018-07-31 | Multi-Stage Fracture | 1244.1 | 1244.2 | 0 |
2018-07-31 | Multi-Stage Fracture | 1220.8 | 1220.9 | 0 |
2018-07-31 | Multi-Stage Fracture | 1197.5 | 1197.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1174.5 | 1174.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1150.9 | 1151 | 0 |
2018-07-31 | Multi-Stage Fracture | 1127.9 | 1128 | 0 |
2018-07-31 | Multi-Stage Fracture | 1104.5 | 1104.6 | 0 |
2018-07-31 | Multi-Stage Fracture | 1080.8 | 1080.9 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
07/31/2018 | 07/31/2018 | Methyl Alcohol | 67-56-1 | Bactericide/Biocide | 0.0113 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
7/25/2018 | 7/25/2018 0:00 | Central Water Distribution Facility | 84 |
7/25/2018 | 7/25/2018 0:00 | Municipal Water | 434 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 3358 | 162.6 | 0.0 | 825.0 |
2019 | 2150 | 63.5 | 0.0 | 434.5 |
For data sources see[8]