X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354093411030

Well Details

Well ID: 0354093411030
Loading map...
Location: 03/11-34-035-09W4/0
Location Alias: 03/11-34-35-09 W4M
Location Alias 2: 03/11-34-035-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 103 HZ PROVOST 11-34-35-9
Operator Name: Karve Energy Inc.
License Number: 0489232
License Date: 2018-05-22
License Status: Issued
Spud Date: 2018-07-13
Final Drill Date: 2018-07-15
Well Total Depth: 1778 m
Surface Hole Latitude: 52.056693
Surface Hole Longitude: -111.201055

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
13 Jul 2018 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-13 604
2018-07-14 1026 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-26 Multi-Stage Fracture 1741.7 1741.8 0
2018-07-26 Multi-Stage Fracture 1718.3 1718.4 0
2018-07-26 Multi-Stage Fracture 1694.6 1694.7 0
2018-07-26 Multi-Stage Fracture 1670.9 1671 0
2018-07-26 Multi-Stage Fracture 1647.6 1647.7 0
2018-07-26 Multi-Stage Fracture 1624.1 1624.2 0
2018-07-26 Multi-Stage Fracture 1554.6 1554.7 0
2018-07-26 Multi-Stage Fracture 1520.2 1520.3 0
2018-07-26 Multi-Stage Fracture 1451 1451.1 0
2018-07-26 Multi-Stage Fracture 1415.8 1415.9 0
2018-07-26 Multi-Stage Fracture 1380.9 1381 0
2018-07-26 Multi-Stage Fracture 1345.8 1345.9 0
2018-07-26 Multi-Stage Fracture 1322.2 1322.3 0
2018-07-26 Multi-Stage Fracture 1298.4 1298.5 0
2018-07-26 Multi-Stage Fracture 1274.7 1274.8 0
2018-07-26 Multi-Stage Fracture 1239.4 1239.5 0
2018-07-26 Multi-Stage Fracture 1181.2 1181.3 0
2018-07-27 Multi-Stage Fracture 1111.5 1111.6 0
2018-07-27 Multi-Stage Fracture 1087.9 1088 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
07/26/2018 07/27/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0108 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
7/20/2018 7/20/2018 0:00 Central Water Distribution Facility 108
7/20/2018 7/20/2018 0:00 Municipal Water 476

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3162 74.4 0.0 976.6
2019 2139 76.6 0.0 599.1

For data sources see[8]

References