If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354091216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.995476,"lon":-111.163549,"icon":""}]} |
Location: 00/16-12-035-09W4/0 | |
Location Alias: 00/16-12-35-09 W4M | |
Location Alias 2: 00/16-12-035-09 W4/00 | |
Province: Alberta | |
County/Municipality: Special Area No. 4 | |
Well Name: KARVE HZ PROVOST 16-12-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0489975 | |
License Date: 2018-07-11 | |
License Status: Issued | |
Spud Date: 2018-08-01 | |
Final Drill Date: 2018-08-03 | |
Well Total Depth: 1768 m | |
Surface Hole Latitude: 51.995476 | |
Surface Hole Longitude: -111.163549 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
01 Aug 2018 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-02 | 606 | |
2018-08-03 | 1032 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-21 | Multi-Stage Fracture | 1732.1 | 1732.2 | 0 |
2018-08-21 | Multi-Stage Fracture | 1696.9 | 1697 | 0 |
2018-08-21 | Multi-Stage Fracture | 1661.8 | 1661.9 | 0 |
2018-08-21 | Multi-Stage Fracture | 1615.2 | 1615.3 | 0 |
2018-08-21 | Multi-Stage Fracture | 1591.6 | 1591.7 | 0 |
2018-08-21 | Multi-Stage Fracture | 1557 | 1557.1 | 0 |
2018-08-21 | Multi-Stage Fracture | 1522.2 | 1522.3 | 0 |
2018-08-21 | Multi-Stage Fracture | 1487.1 | 1487.2 | 0 |
2018-08-21 | Multi-Stage Fracture | 1451.9 | 1452 | 0 |
2018-08-21 | Multi-Stage Fracture | 1416.8 | 1416.9 | 0 |
2018-08-21 | Multi-Stage Fracture | 1381.6 | 1381.7 | 0 |
2018-08-21 | Multi-Stage Fracture | 1346.6 | 1346.7 | 0 |
2018-08-21 | Multi-Stage Fracture | 1311.4 | 1311.5 | 0 |
2018-08-21 | Multi-Stage Fracture | 1276.6 | 1276.7 | 0 |
2018-08-21 | Multi-Stage Fracture | 1242.2 | 1242.3 | 0 |
2018-08-21 | Multi-Stage Fracture | 1207.4 | 1207.5 | 0 |
2018-08-21 | Multi-Stage Fracture | 1172.7 | 1172.8 | 0 |
2018-08-21 | Multi-Stage Fracture | 1137.9 | 1138 | 0 |
2018-08-21 | Multi-Stage Fracture | 1103 | 1103.1 | 0 |
2018-08-21 | Multi-Stage Fracture | 1068.2 | 1068.3 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
08/21/2018 | 08/21/2018 | Methyl Alcohol | 67-56-1 | Bactericide/Biocide | 0.0109 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
8/13/2018 | 8/13/2018 0:00 | Central Water Distribution Facility | 101 |
8/13/2018 | 8/13/2018 0:00 | Municipal Water | 602 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2964 | 141.9 | 0.0 | 1139.3 |
2019 | 2159 | 178.4 | 0.0 | 860.2 |
For data sources see[8]