X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354091216000

Well Details

Well ID: 0354091216000
Loading map...
Location: 00/16-12-035-09W4/0
Location Alias: 00/16-12-35-09 W4M
Location Alias 2: 00/16-12-035-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE HZ PROVOST 16-12-35-9
Operator Name: Karve Energy Inc.
License Number: 0489975
License Date: 2018-07-11
License Status: Issued
Spud Date: 2018-08-01
Final Drill Date: 2018-08-03
Well Total Depth: 1768 m
Surface Hole Latitude: 51.995476
Surface Hole Longitude: -111.163549

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
01 Aug 2018 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-08-02 606
2018-08-03 1032 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-21 Multi-Stage Fracture 1732.1 1732.2 0
2018-08-21 Multi-Stage Fracture 1696.9 1697 0
2018-08-21 Multi-Stage Fracture 1661.8 1661.9 0
2018-08-21 Multi-Stage Fracture 1615.2 1615.3 0
2018-08-21 Multi-Stage Fracture 1591.6 1591.7 0
2018-08-21 Multi-Stage Fracture 1557 1557.1 0
2018-08-21 Multi-Stage Fracture 1522.2 1522.3 0
2018-08-21 Multi-Stage Fracture 1487.1 1487.2 0
2018-08-21 Multi-Stage Fracture 1451.9 1452 0
2018-08-21 Multi-Stage Fracture 1416.8 1416.9 0
2018-08-21 Multi-Stage Fracture 1381.6 1381.7 0
2018-08-21 Multi-Stage Fracture 1346.6 1346.7 0
2018-08-21 Multi-Stage Fracture 1311.4 1311.5 0
2018-08-21 Multi-Stage Fracture 1276.6 1276.7 0
2018-08-21 Multi-Stage Fracture 1242.2 1242.3 0
2018-08-21 Multi-Stage Fracture 1207.4 1207.5 0
2018-08-21 Multi-Stage Fracture 1172.7 1172.8 0
2018-08-21 Multi-Stage Fracture 1137.9 1138 0
2018-08-21 Multi-Stage Fracture 1103 1103.1 0
2018-08-21 Multi-Stage Fracture 1068.2 1068.3 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/21/2018 08/21/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0109 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
8/13/2018 8/13/2018 0:00 Central Water Distribution Facility 101
8/13/2018 8/13/2018 0:00 Municipal Water 602

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2964 141.9 0.0 1139.3
2019 2159 178.4 0.0 860.2

For data sources see[8]

References