X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090406040

Well Details

Well ID: 0354090406040
Loading map...
Location: 04/06-04-035-09W4/0
Location Alias: 04/06-04-35-09 W4M
Location Alias 2: 04/06-04-035-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 104 HZ PROVOST 6-4-35-9
Operator Name: Karve Energy Inc.
License Number: 0488450
License Date: 2018-03-05
License Status: Issued
Spud Date: 2018-06-17
Final Drill Date: 2018-06-19
Well Total Depth: 1638 m
Surface Hole Latitude: 51.974217
Surface Hole Longitude: -111.245141

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
17 Jun 2018 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-06-18 631
2018-06-18 992 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-30 Multi-Stage Fracture 1602 1602.1 0
2018-06-30 Multi-Stage Fracture 1578.2 1578.3 0
2018-06-30 Multi-Stage Fracture 1554.5 1554.6 0
2018-06-30 Multi-Stage Fracture 1531 1531.1 0
2018-06-30 Multi-Stage Fracture 1507.6 1507.7 0
2018-06-30 Multi-Stage Fracture 1484.1 1484.2 0
2018-06-30 Multi-Stage Fracture 1460.4 1460.5 0
2018-06-30 Multi-Stage Fracture 1436.7 1436.8 0
2018-06-30 Multi-Stage Fracture 1413.2 1413.3 0
2018-06-30 Multi-Stage Fracture 1389.5 1389.6 0
2018-06-30 Multi-Stage Fracture 1365.7 1365.8 0
2018-06-30 Multi-Stage Fracture 1342.1 1342.2 0
2018-06-30 Multi-Stage Fracture 1307.2 1307.3 0
2018-06-30 Multi-Stage Fracture 1260.9 1261 0
2018-06-30 Multi-Stage Fracture 1225.7 1225.8 0
2018-06-30 Multi-Stage Fracture 1190.5 1190.6 0
2018-06-30 Multi-Stage Fracture 1155.2 1155.3 0
2018-06-30 Multi-Stage Fracture 1120.1 1120.2 0
2018-06-30 Multi-Stage Fracture 1085 1085.1 0
2018-06-30 Multi-Stage Fracture 1050.1 1050.2 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
06/30/2018 06/30/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.011 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
6/20/2018 6/20/2018 0:00 Central Water Distribution Facility 119
6/20/2018 6/20/2018 0:00 Municipal Water 638

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4243 265.1 0.0 1249.1
2019 2098 205.5 0.0 403.7

For data sources see[8]

References