If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090406040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.974217,"lon":-111.245141,"icon":""}]} |
Location: 04/06-04-035-09W4/0 | |
Location Alias: 04/06-04-35-09 W4M | |
Location Alias 2: 04/06-04-035-09 W4/00 | |
Province: Alberta | |
County/Municipality: Special Area No. 4 | |
Well Name: KARVE 104 HZ PROVOST 6-4-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0488450 | |
License Date: 2018-03-05 | |
License Status: Issued | |
Spud Date: 2018-06-17 | |
Final Drill Date: 2018-06-19 | |
Well Total Depth: 1638 m | |
Surface Hole Latitude: 51.974217 | |
Surface Hole Longitude: -111.245141 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
17 Jun 2018 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-06-18 | 631 | |
2018-06-18 | 992 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-06-30 | Multi-Stage Fracture | 1602 | 1602.1 | 0 |
2018-06-30 | Multi-Stage Fracture | 1578.2 | 1578.3 | 0 |
2018-06-30 | Multi-Stage Fracture | 1554.5 | 1554.6 | 0 |
2018-06-30 | Multi-Stage Fracture | 1531 | 1531.1 | 0 |
2018-06-30 | Multi-Stage Fracture | 1507.6 | 1507.7 | 0 |
2018-06-30 | Multi-Stage Fracture | 1484.1 | 1484.2 | 0 |
2018-06-30 | Multi-Stage Fracture | 1460.4 | 1460.5 | 0 |
2018-06-30 | Multi-Stage Fracture | 1436.7 | 1436.8 | 0 |
2018-06-30 | Multi-Stage Fracture | 1413.2 | 1413.3 | 0 |
2018-06-30 | Multi-Stage Fracture | 1389.5 | 1389.6 | 0 |
2018-06-30 | Multi-Stage Fracture | 1365.7 | 1365.8 | 0 |
2018-06-30 | Multi-Stage Fracture | 1342.1 | 1342.2 | 0 |
2018-06-30 | Multi-Stage Fracture | 1307.2 | 1307.3 | 0 |
2018-06-30 | Multi-Stage Fracture | 1260.9 | 1261 | 0 |
2018-06-30 | Multi-Stage Fracture | 1225.7 | 1225.8 | 0 |
2018-06-30 | Multi-Stage Fracture | 1190.5 | 1190.6 | 0 |
2018-06-30 | Multi-Stage Fracture | 1155.2 | 1155.3 | 0 |
2018-06-30 | Multi-Stage Fracture | 1120.1 | 1120.2 | 0 |
2018-06-30 | Multi-Stage Fracture | 1085 | 1085.1 | 0 |
2018-06-30 | Multi-Stage Fracture | 1050.1 | 1050.2 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
06/30/2018 | 06/30/2018 | Methyl Alcohol | 67-56-1 | Bactericide/Biocide | 0.011 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
6/20/2018 | 6/20/2018 0:00 | Central Water Distribution Facility | 119 |
6/20/2018 | 6/20/2018 0:00 | Municipal Water | 638 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4243 | 265.1 | 0.0 | 1249.1 |
2019 | 2098 | 205.5 | 0.0 | 403.7 |
For data sources see[8]