If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.97935,"lon":-111.192723,"icon":""}]} |
Location: 00/06-02-035-09W4/0 | |
Location Alias: 00/06-02-35-09 W4M | |
Location Alias 2: 00/06-02-035-09 W4/00 | |
Province: Alberta | |
County/Municipality: Special Area No. 4 | |
Well Name: KARVE HZ PROVOST 6-2-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0485971 | |
License Date: 2017-10-23 | |
License Status: Issued | |
Spud Date: 2017-11-09 | |
Final Drill Date: 2017-11-12 | |
Well Total Depth: 1703 m | |
Surface Hole Latitude: 51.97935 | |
Surface Hole Longitude: -111.192723 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
09 Nov 2017 | Ensign Drilling Inc. | 348 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-11-10 | 620 | |
2017-11-11 | 1022 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-12-10 | Perforation | 993 | 994 | 20 |
2017-12-11 | Perforation | 788.5 | 789.5 | 20 |
2017-12-12 | Remedial Casing Cementing | 788.5 | 789.5 | 0 |
2017-12-12 | Cement Plug | 560 | 1010 | 0 |
2018-01-12 | Multi-Stage Fracture | 1501.9 | 1502 | 0 |
2018-01-12 | Multi-Stage Fracture | 1478.6 | 1478.7 | 0 |
2018-01-12 | Multi-Stage Fracture | 1444.9 | 1445 | 0 |
2018-01-12 | Multi-Stage Fracture | 1399.4 | 1399.5 | 0 |
2018-01-12 | Multi-Stage Fracture | 1365.6 | 1365.7 | 0 |
2018-01-12 | Multi-Stage Fracture | 1275.5 | 1275.6 | 0 |
2018-01-12 | Multi-Stage Fracture | 1229.9 | 1230 | 0 |
2018-01-12 | Multi-Stage Fracture | 1129.1 | 1129.2 | 0 |
2018-01-12 | Multi-Stage Fracture | 1106.6 | 1106.7 | 0 |
2018-01-12 | Multi-Stage Fracture | 1083.6 | 1083.7 | 0 |
2018-01-12 | Multi-Stage Fracture | 1060.5 | 1060.6 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
01/12/2018 | 01/12/2018 | Methyl Alcohol | 67-56-1 | Bactericide/Biocide | 0.0235 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
1/8/2018 0 | 1/8/2018 0:00 | Central Water Distribution Facility | 46 |
1/7/2018 0 | 1/8/2018 0:00 | Municipal Water | 269 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7398 | 10.5 | 0.0 | 686.3 |
2019 | 2081 | 7.4 | 0.0 | 286.4 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-13 | No Incident | N/A | N/A |
2017-12-08 | No Incident | N/A | N/A |
2018-01-17 | No Incident | N/A | N/A |
For data sources see[9]