If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090109020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.983537,"lon":-111.153667,"icon":""}]} |
Location: 02/09-01-035-09W4/0 | |
Location Alias: 02/09-01-35-09 W4M | |
Location Alias 2: 02/09-01-035-09 W4/00 | |
Province: Alberta | |
County/Municipality: Special Area No. 4 | |
Well Name: KARVE 102 HZ PROVOST 9-1-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0488480 | |
License Date: 2018-03-07 | |
License Status: Issued | |
Spud Date: 2018-07-22 | |
Final Drill Date: 2018-07-24 | |
Well Total Depth: 1585 m | |
Surface Hole Latitude: 51.983537 | |
Surface Hole Longitude: -111.153667 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
22 Jul 2018 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-07-23 | 654 | |
2018-07-23 | 1010 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-12 | Multi-Stage Fracture | 1549.1 | 1549.2 | 0 |
2018-08-12 | Multi-Stage Fracture | 1525.8 | 1525.9 | 0 |
2018-08-12 | Multi-Stage Fracture | 1502.4 | 1502.5 | 0 |
2018-08-12 | Multi-Stage Fracture | 1478.9 | 1479 | 0 |
2018-08-12 | Multi-Stage Fracture | 1455.6 | 1455.7 | 0 |
2018-08-12 | Multi-Stage Fracture | 1432.4 | 1432.5 | 0 |
2018-08-12 | Multi-Stage Fracture | 1409 | 1409.1 | 0 |
2018-08-12 | Multi-Stage Fracture | 1385.6 | 1385.7 | 0 |
2018-08-12 | Multi-Stage Fracture | 1362.2 | 1362.3 | 0 |
2018-08-12 | Multi-Stage Fracture | 1338.6 | 1338.7 | 0 |
2018-08-12 | Multi-Stage Fracture | 1315.4 | 1315.5 | 0 |
2018-08-12 | Multi-Stage Fracture | 1291.8 | 1291.9 | 0 |
2018-08-12 | Multi-Stage Fracture | 1268.3 | 1268.4 | 0 |
2018-08-12 | Multi-Stage Fracture | 1244.8 | 1244.9 | 0 |
2018-08-12 | Multi-Stage Fracture | 1210.1 | 1210.2 | 0 |
2018-08-12 | Multi-Stage Fracture | 1175.4 | 1175.5 | 0 |
2018-08-12 | Multi-Stage Fracture | 1140.6 | 1140.7 | 0 |
2018-08-12 | Multi-Stage Fracture | 1106 | 1106.1 | 0 |
2018-08-12 | Multi-Stage Fracture | 1071.4 | 1071.5 | 0 |
2018-08-12 | Multi-Stage Fracture | 1036.6 | 1036.7 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
08/12/2018 | 08/12/2018 | Methyl Alcohol | 67-56-1 | Bactericide/Biocide | 0.0109 | Step Energy Services |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
8/1/2018 0 | 8/1/2018 0:00 | Central Water Distribution Facility | 86 |
8/1/2018 0 | 8/1/2018 0:00 | Municipal Water | 329 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 3089 | 199.1 | 0.0 | 1092.7 |
2019 | 2154 | 173.3 | 0.0 | 480.9 |
For data sources see[8]