X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090105020

Well Details

Well ID: 0354090105020
Loading map...
Location: 02/05-01-035-09W4/0
Location Alias: 02/05-01-35-09 W4M
Location Alias 2: 02/05-01-035-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 102 HZ PROVOST 5-1-35-9
Operator Name: Karve Energy Inc.
License Number: 0486342
License Date: 2017-11-16
License Status: Issued
Spud Date: 2017-12-05
Final Drill Date: 2017-12-07
Well Total Depth: 1741 m
Surface Hole Latitude: 51.968172
Surface Hole Longitude: -111.161332

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
05 Dec 2017 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-12-06 681
2017-12-06 985 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-11 Multi-Stage Fracture 1697.2 1697.3 0
2017-12-11 Multi-Stage Fracture 1669.5 1669.6 0
2017-12-11 Multi-Stage Fracture 1641.8 1641.9 0
2017-12-11 Multi-Stage Fracture 1614 1614.1 0
2017-12-11 Multi-Stage Fracture 1586.2 1586.3 0
2017-12-11 Multi-Stage Fracture 1558.5 1558.6 0
2017-12-11 Multi-Stage Fracture 1530.7 1530.8 0
2017-12-12 Multi-Stage Fracture 1503.2 1503.3 0
2017-12-12 Multi-Stage Fracture 1462 1462.1 0
2017-12-12 Multi-Stage Fracture 1420.9 1421 0
2017-12-12 Multi-Stage Fracture 1379.6 1379.7 0
2017-12-12 Multi-Stage Fracture 1338.6 1338.7 0
2017-12-12 Multi-Stage Fracture 1297.4 1297.5 0
2017-12-12 Multi-Stage Fracture 1256.2 1256.3 0
2017-12-12 Multi-Stage Fracture 1215.3 1215.4 0
2017-12-12 Multi-Stage Fracture 1174.2 1174.3 0
2017-12-12 Multi-Stage Fracture 1133 1133.1 0
2017-12-12 Multi-Stage Fracture 1091.8 1091.9 0
2017-12-12 Multi-Stage Fracture 1051 1051.1 0
2017-12-12 Multi-Stage Fracture 1010 1010.1 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
12/11/2017 12/12/2017 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0078 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/9/2017 12/9/2017 0:00 Central Water Distribution Facility 98
12/9/2017 12/11/2017 0:00 Municipal Water 574

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 312 16.0 0.0 0.0
2018 8574 552.0 0.0 1664.6
2019 2135 85.6 0.0 279.8

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-08 No Incident N/A N/A
2017-12-17 No Incident N/A N/A

For data sources see[9]

References