X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354082708020

Well Details

Well ID: 0354082708020
Loading map...
Location: 02/08-27-035-08W4/0
Location Alias: 02/08-27-35-08 W4M
Location Alias 2: 02/08-27-035-08 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 102 HZ PROVOST 8-27-35-8
Operator Name: Karve Energy Inc.
License Number: 0490219
License Date: 2018-07-26
License Status: Issued
Spud Date: 2018-08-21
Final Drill Date: 2018-08-23
Well Total Depth: 1628 m
Surface Hole Latitude: 52.025215
Surface Hole Longitude: -111.057846

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
21 Aug 2018 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-08-22 591
2018-08-22 1003 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-11 Multi-Stage Fracture 1591.3 1591.4 0
2018-09-11 Multi-Stage Fracture 1567.3 1567.4 0
2018-09-11 Multi-Stage Fracture 1543.2 1543.3 0
2018-09-11 Multi-Stage Fracture 1519 1519.1 0
2018-09-11 Multi-Stage Fracture 1494.8 1494.9 0
2018-09-11 Multi-Stage Fracture 1470.7 1470.8 0
2018-09-11 Multi-Stage Fracture 1446.5 1446.6 0
2018-09-11 Multi-Stage Fracture 1422.6 1422.7 0
2018-09-11 Multi-Stage Fracture 1398.4 1398.5 0
2018-09-11 Multi-Stage Fracture 1374.3 1374.4 0
2018-09-11 Multi-Stage Fracture 1315.1 1315.2 0
2018-09-11 Multi-Stage Fracture 1291.1 1291.2 0
2018-09-11 Multi-Stage Fracture 1267.2 1267.3 0
2018-09-11 Multi-Stage Fracture 1243.2 1243.3 0
2018-09-11 Multi-Stage Fracture 1219.2 1219.3 0
2018-09-11 Multi-Stage Fracture 1195.1 1195.2 0
2018-09-11 Multi-Stage Fracture 1170.9 1171 0
2018-09-11 Multi-Stage Fracture 1135.1 1135.2 0
2018-09-11 Multi-Stage Fracture 1099.3 1099.4 0
2018-09-11 Multi-Stage Fracture 1063.7 1063.8 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
09/11/2018 09/11/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0114 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
8/24/2018 8/24/2018 0:00 Central Water Distribution Facility 111
8/24/2018 8/24/2018 0:00 Municipal Water 364

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2150 97.0 0.0 440.4
2019 2156 107.1 0.0 331.4

For data sources see[8]

References